WELL · 42-421-30986 · DISTRICT 10
Lamb #2
Sherman County · Texas Hugoton field · Producing · Horizontal
Lamb #2 (API 42-421-30986) is a horizontal well in Sherman County operated by Questa Operating Company LLC, completed November 17, 2009 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2004 and 2009, permitted to 4,000 ft.
Completion filings report 7 formation tops, including Cimmanon, Red Cave, Panhandle, Panhandle Lm.
No lease production has been reported under this well’s leases.
Operator of record
Amarillo, TX · P-5 Y, filed Oct 4, 2025 · 16 permits on file · (806) 678-0534
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Questa Operating Company LLC |
| Production reports | Questa Operating Company, LLCthrough Apr 2026 |
| Latest permit | Questa Operating Company, LLCJun 18, 2009 |
- 4,000
- total depth, ft
- 2
- permits on file
- Jun 18, 2009
- last permit issued
- Nov 17, 2009
- completed
- 0
- cumulative oil, bbl
- 643K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 17, 2009
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lamb G-14-202532 | Texas Hugoton | Questa Operating Company, LLC | 1 | 0 | 643K | Apr 2004 – Jul 2026 |
Gas, mcf lease total
Last 12 months 25,378 · prior 12 24,742(+3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jones Energy, Ltd.May 2004 → May 2007
- 2Laredo Petroleum, Inc.Jun 2007 → Jan 2009
- 3Questa Operating Company, LLCFeb 2009 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 681840-99 | Recompletion | Questa Operating Company, LLC | Jun 4, 2009 | Jun 18, 2009 | Sep 3, 2009 | 3,550 |
| 543397-99 | Drill | Jones Energy, Ltd. | Mar 17, 2004 | Mar 17, 2004 | Mar 22, 2004 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-202532 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,573 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cimmanon | 1,560 | 2,013 |
| Red Cave | 1,930 | 1,643 |
| Panhandle | 2,665 | 908 |
| Panhandle LM | 2,665 | 908 |
| Br. Dolomite | 2,970 | 603 |
| Brown Dolo. | 2,970 | 603 |
| Moore Co. Lime | 3,272 | 301 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,956 | 6,632 | Perforated |
| 2,960 | 3,355 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 608 | 11 | 250 S |
| 5.5 | 2,900 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 26, 2010 | Dec 3, 2009 | Yes |
| 00 | Sep 3, 2004 | Jun 14, 2004 | Yes |
| 00 | Aug 3, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-421-30986 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-421-30986 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42130986, documented in the API reference.