WELL · 42-421-31011 · DISTRICT 10
Dettle #1067
Sherman County · Texas Hugoton field · Horizontal
Dettle #1067 (API 42-421-31011) is a plugged horizontal well in Sherman County, plugged September 29, 2008, last operated by Hadaway Engineering Inc..
The RRC has issued one drilling permit (amended twice), issued October 12, 2005, permitted to 3,400 ft.
Completion filings report one formation top, including Brown Dolomite.
Operator of record
Canadian, TX · P-5 Y, filed May 4, 2012 · 14 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hadaway Engineering Inc. |
| Production reports | none |
| Latest permit | Hadaway Engineering Inc.Oct 12, 2005 |
- 3,400
- total depth, ft
- 3
- permits on file
- Oct 12, 2005
- last permit issued
- Mar 9, 2006
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Sep 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 9, 2006
- Shut in
- —
- Plugged
- Sep 29, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dettle G-14-230974 | Texas Hugoton | Hadaway Engineering Inc. | 1 | 0 | 0 | Mar 2006 – Sep 2008 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 607617-97 | Drill | Hadaway Engineering Inc. | May 25, 2006 | Oct 12, 2005 | Jan 12, 2006 | 3,200 |
| 607617-98 | Drill | Hadaway Engineering Inc. | Mar 3, 2006 | Oct 12, 2005 | Jan 12, 2006 | 3,400 |
| 607617-99 | Drill | Hadaway Engineering Inc. | Oct 10, 2005 | Oct 12, 2005 | Jan 12, 2006 | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-230974 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,591 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,746 | 845 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,514 | 3,709 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,527 | 12.25 | 700 S |
| 5.5 | 2,432 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 18, 2008 | Mar 21, 2006 | Yes |
| 00 | Nov 29, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-421-31011 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-421-31011 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42131011, documented in the API reference.