WELL · 42-423-20011 · DISTRICT 6
Johnston-Hairston #1
Smith County · Tyler South (Paluxy) field · Vertical
Johnston-Hairston #1 (API 42-423-20011) is a plugged well in Smith County, plugged January 27, 1994, last operated by Wagner Duer & CO..
The RRC has issued one drilling permit, issued August 4, 1988, permitted to 7,475 ft.
It was permitted by Basin Operating CO. Ltd. and has since transferred to Wagner Duer & CO. on the wellbore schedule.
Completion filings report 4 formation tops, including Austin Chalk, Woodbine, Comanchie, Paluxy.
Its lease has reported 32 barrels of oil since January 1993, last reporting in October 1994.
Operator of record
Permitted by Basin Operating Co. Ltd.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Sep 3, 1999 · 162 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wagner Duer & Co. |
| Production reports | Wagner, Duer & Co.through Jan 1994 |
| Latest permit | Basin Operating Co. Ltd.Aug 4, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,475
- total depth, ft
- 1
- permits on file
- Aug 4, 1988
- last permit issued
- Oct 5, 1988
- completed
- 32
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 5, 1988
- Shut in
- —
- Plugged
- Jan 27, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnston-Hairston O-6-12470 | Tyler, South (Paluxy) | Wagner, Duer & Co. | 1 | 32 | 0 | Jan 1993 – Oct 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wagner, Duer & Co.Jan 1994 → Jan 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 349794-99 | Reenter | Basin Operating Co. Ltd. | Aug 4, 1988 | Aug 4, 1988 | — | 7,475 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-12470 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 467 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkBASE OF AUSTIN CHALK | 4,902 | -4,435 |
| Woodbine | 5,183 | -4,716 |
| Comanchie | 6,247 | -5,780 |
| Paluxy | 7,387 | -6,920 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,430 | 7,432 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 355 | — | — |
| 4.5 | 7,476 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 7, 1988 | Nov 9, 1988 | Yes |
| 00 | Dec 2, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-20011 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-20011 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42320011, documented in the API reference.