WELL · 42-423-30138 · DISTRICT 6

Johnson W. F. Gas Unit #1

Plugged

Smith County · Overton (Haynesville) field  · Vertical

Johnson W. F. Gas Unit #1 (API 42-423-30138) is a plugged well in Smith County, plugged January 19, 2013, last operated by Sabine Oil & Gas LLC.

The RRC has issued one drilling permit, issued August 31, 2007, permitted to 13,000 ft.

It was permitted by Rusk Energy Management, LLC and has since transferred to Sabine Oil & Gas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including B/Austin Chalk, T/Goodland Lime, T/Paluxy, T/Pettit.

Operator of record

Sabine Oil & Gas LLC

Permitted by Rusk Energy Management, LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 2, 2015 · 224 permits on file · (866) 520-0402

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSabine Oil & Gas LLC
Production reportsNFR Energy, LLCthrough Aug 2011
Latest permitRusk Energy Management, LLCAug 31, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Aug 31, 2007
last permit issued
Jun 23, 1975
completed
0
cumulative oil, bbl
598K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 23, 1975
Shut in
—
Plugged
Jan 19, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson, W. F. Gas Unit G-6-63872Overton (Haynesville)NFR Energy, LLC10514KJan 1993 – Jan 2013
Johnson, W F GU G-6-235962Overton (Cotton Valley Sand)NFR Energy, LLC1084KSep 2007 – Jan 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kerr-McGee CorporationJan 1993 → Jul 1996
  2. 2Nuevo Energy CompanyAug 1996 → Dec 1998
  3. 3Samson Lone Star LPJan 1999 → Sep 2001
  4. 4Arena Resources, L. L. C.Apr 2003 → Sep 2006
  5. 5Rusk Energy Management, LLCJun 2007 → Dec 2007
  6. 6NFR Energy, LLCJan 2008 → Aug 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
645195-99RecompletionRusk Energy Management, LLCAug 28, 2007Aug 31, 2007Aug 14, 200713,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-63872————
—— G-6-235962————

Formation tops

As filed on W-2/G-1. Subsea from 447 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin Chalk3,757-3,310
T/Goodland Lime5,064-4,617
T/Paluxy5,214-4,767
T/Pettit7,803-7,356
T/Travis Peak8,009-7,562
T/Bossier11,454-11,007

Perforations

Perforated and open-hole intervals.

FromToType
11,18611,190Perforated
11,20811,202Perforated
11,22311,226Perforated
11,27211,274Perforated
11,28011,282Perforated
11,29311,296Perforated
11,30611,310Perforated
11,34611,349Perforated
11,41611,418Perforated
11,42911,432Perforated
11,70611,210Perforated
12,01412,030Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.375308——
9.6254,095——
5.512,129——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 30, 2008Dec 21, 2007—
00Jun 12, 2008——
00Jan 12, 1984Oct 16, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42330138, documented in the API reference.