WELL · 42-423-30854 · DISTRICT 6
Philips-Bonnville #2
Smith County · Chapel Hill (Travis Peak) field · Vertical
Philips-Bonnville #2 (API 42-423-30854) is a well in Smith County operated by Cibola Oil & Gas Corp., completed September 13, 1984.
The RRC has issued one drilling permit, issued July 17, 1984, permitted to 8,700 ft.
Completion filings report 3 formation tops, including Pettit, T/Pettit, B/Pettit.
Its lease has reported 63.9K barrels of oil and 307K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Tyler, TX · P-5 Y, filed Jan 13, 1987 · 42 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cibola Oil & Gas Corp. |
| Production reports | Ellis Exploration, Inc.through Apr 2026 |
| Latest permit | Cibola Oil & Gas Corp.Jul 17, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,700
- total depth, ft
- 1
- permits on file
- Jul 17, 1984
- last permit issued
- Sep 13, 1984
- completed
- 63.9K
- cumulative oil, bbl
- 307K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 13, 1984
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Philips-Bonnville O-6-11646 | Chapel Hill (Pettit) | Ellis Exploration, Inc. | 1 | 63.9K | 307K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,770 · prior 12 1,825(-3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Eland Energy, Inc.Jan 1993 → Sep 1995
- 2Linder, John G. Jr.Oct 1995 → May 1997
- 3Ellis Exploration, Inc.Apr 2000 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 245342-99 | Drill | Cibola Oil & Gas Corp. | Dec 27, 1984 | Jul 17, 1984 | Aug 3, 1984 | 8,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-11646 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 482 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettit | 8,248 | -7,766 |
| T/Pettit | 8,248 | -7,766 |
| B/Pettit | 8,410 | -7,928 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,298 | 8,302 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,226 | 12.25 | 525 S |
| 4.5 | 8,573 | 7.875 | 820 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 1985 | Nov 7, 1984 | — |
| 00 | Mar 19, 1985 | — | — |
| 00 | Oct 19, 1984 | Sep 25, 1984 | — |
| 00 | Oct 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-30854 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-30854 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42330854, documented in the API reference.