WELL · 42-423-30929 · DISTRICT 6

Gee Jessie C #1

Y

Smith County · Chapel Hill (Travis Peak) field · Producing  · Vertical

Gee Jessie C #1 (API 42-423-30929) is a well in Smith County operated by Linder John Operating CO. LLC, completed February 13, 1985 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1984 and 1995, permitted to 8,800 ft.

It was permitted by Roosth & Genecov Production CO. and has since transferred to Linder John Operating CO. LLC on the wellbore schedule.

Completion filings report 7 formation tops, including Woodbime, Woodbine, Paluxy, Rodessa.

Its lease has reported 54.9K barrels of oil and 500K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Linder John Operating Co. LLC

Permitted by Roosth & Genecov Production Co.; the EWA schedule now lists a different operator.

Gladewater, TX · P-5 Y, filed Sep 4, 2025 · 14 permits on file · (903) 845-4240

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLinder John Operating Co. LLC
Production reportsLinder, John Operating Co., LLCthrough Apr 2026
Latest permitRoosth & Genecov Production Co.Nov 8, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,800
total depth, ft
2
permits on file
Nov 8, 1995
last permit issued
Feb 13, 1985
completed
54.9K
cumulative oil, bbl
500K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 13, 1985
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gee, Jessie "C" O-6-11680Chapel Hill (Travis Peak)Linder, John Operating Co., LLC154.9K500KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 26 · prior 12 14(+86%)

0123202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Roosth & Genecov Production Co.Jan 1993 → Dec 1996
  2. 2Roosth Production Co.Jan 1997 → Apr 2017
  3. 3Linder, John Operating Co., LLCMay 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
441680-99RecompletionRoosth & Genecov Production Co.Nov 8, 1995Nov 8, 1995—8,600
259964-99DrillRoosth & Genecov Production Co.Dec 5, 1984Dec 5, 1984—8,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-11680————

Formation tops

As filed on W-2/G-1. Subsea from 468 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbime3,960-3,492
Woodbine3,960-3,492
Paluxy5,543-5,075
Rodessa7,370-6,902
James LimeJAMES7,829-7,361
PettitPETTET8,000-7,532
Pettit8,000-7,532
Travis Peak8,230-7,762

Perforations

Perforated and open-hole intervals.

FromToType
7,4647,468Perforated
7,5267,532Perforated
8,1338,142Perforated
8,3568,436Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,17811266 S
5.58,6247.8751,182 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 1999Nov 10, 1995—
00Jun 19, 1985Apr 3, 1985—
00May 3, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42330929, documented in the API reference.