WELL · 42-423-31191 · DISTRICT 6

Wilkinson Gordon #1

Plugged

Smith County · Chapel Hill (Rodessa) field  · Vertical

Wilkinson Gordon #1 (API 42-423-31191) is a plugged well in Smith County, plugged September 29, 2000, last operated by Thomas B. K..

The RRC has issued 2 drilling permits between 1989 and 1991, permitted to 8,700 ft.

Completion filings report 7 formation tops, including Austin Chalk, Woodbine, Paluxy, Rodess.

Its 2 leases have reported 185 barrels of oil and 29 mcf of gas since January 1993, last reporting in November 2000.

Operator of record

Thomas B. K.

Plano, TX · P-5 Y, filed Aug 7, 1998 · 47 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleThomas B. K.
Production reportsThomas, B. K.through Mar 1997
Latest permitThomas, B. K.Sep 24, 1991
8,700
total depth, ft
2
permits on file
Sep 24, 1991
last permit issued
Apr 13, 1989
completed
185
cumulative oil, bbl
29
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 13, 1989
Shut in
—
Plugged
Sep 29, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilkinson, Gordon O-6-12896Chapel Hill (Pettit)Thomas Operating Ltd. Co.118529Jan 1993 – Nov 2000
— O-6-12694——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thomas, B. K.Apr 1996 → Mar 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
392105-99RecompletionThomas, B. K.Sep 20, 1991Sep 24, 1991Oct 1, 19908,700
357307-99DrillThomas, B. K.Mar 22, 1989Mar 22, 1989—8,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-12694————
—— O-6-12896————

Formation tops

As filed on W-2/G-1. Subsea from 470 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk3,950-3,480
Woodbine4,020-3,550
Paluxy5,650-5,180
Rodess7,656-7,186
Rodessa7,656-7,186
Pettit8,226-7,756
Travis Peak8,476-8,006

Perforations

Perforated and open-hole intervals.

FromToType
7,7817,793Perforated
8,4198,427Perforated
8,4208,428Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,25011245 S
5.58,700—670 S
5.58,7007.8751,030 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 24, 1992Feb 18, 1992—
00Dec 13, 1991Sep 18, 1991Yes
00Oct 28, 1991——
00Aug 13, 1990May 25, 1990Yes
00Jul 24, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42331191, documented in the API reference.