WELL · 42-423-31196 · DISTRICT 6
Anderson Development Corp. #1
Smith County · Crow (Paluxy Lower) field · Directional · Sidetrack
Anderson Development Corp. #1 (API 42-423-31196) is a plugged well in Smith County, plugged October 11, 2011, last operated by Linder John Operating CO. LLC.
The RRC has issued one drilling permit (amended twice), issued May 2, 1989, permitted to 7,700 ft.
It was permitted by Rowan, AL and has since transferred to Linder John Operating CO. LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Austin Chalk, Woodbine, Paluxy.
Its 2 leases have reported 82.5K barrels of oil and 1.62K mcf of gas since January 1993, last reporting in April 2012. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Rowan, AL; the EWA schedule now lists a different operator.
Gladewater, TX · P-5 Y, filed Sep 4, 2025 · 14 permits on file · (903) 845-4240
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Linder John Operating Co. LLC |
| Production reports | Linder, John Operating Co., LLCthrough Apr 2010 |
| Latest permit | Rowan, ALMay 2, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,700
- total depth, ft
- 3
- permits on file
- May 2, 1989
- last permit issued
- Feb 26, 1990
- completed
- 82.5K
- cumulative oil, bbl
- 1.62K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 26, 1990
- Shut in
- —
- Plugged
- Oct 11, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Anderson Development Corp. O-6-12853 | Crow (Paluxy, Lower) | Linder, John Operating Co., LLC | 2 | 82.5K | 1.62K | Jan 1993 – Apr 2012 |
| — O-6-12613 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rowan, ALJan 1993 → Jun 1995
- 2Key Production Company, Inc.Jul 1995 → Aug 2000
- 3Linder, John G. Jr.Sep 2000 → Apr 2005
- 4Linder, John Operating Co., LLCMay 2005 → Apr 2010
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-12613 | — | — | — | — |
| — | — O-6-12853 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 308 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkBASE AUSTIN CHALK | 4,880 | -4,572 |
| Woodbine | 5,352 | -5,044 |
| Paluxy | 7,324 | -7,016 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,356 | 7,366 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,389 | 11 | 420 S |
| 5.5 | 7,414 | 7.875 | 334 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 9, 1991 | Mar 2, 1990 | — |
| 00 | Jul 3, 1991 | Mar 2, 1990 | Yes |
| 00 | Jun 11, 1990 | Mar 2, 1990 | Yes |
| 00 | May 10, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-31196 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-31196 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42331196, documented in the API reference.