WELL · 42-423-31331 · DISTRICT 6

Texas Eastman Div Eastman Chemco #D 2

Y

Smith County · Tyler East (7100 Sand) field · Injection  · Vertical

Texas Eastman Div Eastman Chemco #D 2 (API 42-423-31331) is a well in Smith County operated by Texas Eastman Div Eastman Chemco, completed February 27, 1992 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 17, 1991, permitted to 5,300 ft.

It was permitted by Texas Eastman Company and has since transferred to Texas Eastman Div Eastman Chemco on the wellbore schedule.

Completion filings report 6 formation tops, including Midway, Navarro, Pecan Gap, Austin Chalk.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 270K barrels injected in the 12 months reported through October 2025.

Operator of record

Texas Eastman Div Eastman Chemco

Permitted by Texas Eastman Company; the EWA schedule now lists a different operator.

Longview, TX · P-5 Y, filed Jun 4, 2026 · (800) 677-6839

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexas Eastman Div Eastman Chemco
Production reportsnone
Latest permitTexas Eastman CompanyJul 17, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,300
total depth, ft
2
permits on file
Jul 17, 1991
last permit issued
Feb 27, 1992
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 27, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Texas Eastman Div,eastman Chemco O-6-5954Tyler, East (7100 Sand)Texas Eastman Div,eastman Chemco1300Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
389578-98DrillTexas Eastman CompanyOct 28, 1991Jul 17, 1991Nov 29, 19915,300
389578-99DrillTexas Eastman CompanyJul 3, 1991Jul 17, 1991—5,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-5954————

Formation tops

As filed on W-2/G-1. Subsea from 480 ft elevation.Download CSV →

FormationMD ftSubsea
MidwayMIDWAY SHALE1,700-1,220
NavarroNAVARRO SHALE2,435-1,955
Pecan Gap3,305-2,825
Austin ChalkBASE AUSTIN CHALK4,536-4,056
Eagle FordEAGLEFORD SHALE4,625-4,145
Woodbine4,732-4,252

Perforations

Perforated and open-hole intervals.

FromToType
4,7345,064Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
205726175 S
13.3751,92017.51,650 S
9.6254,71912.251,550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 2001Aug 16, 2000—
00Nov 4, 1992Sep 14, 1992Yes
00Oct 2, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

270K
bbl, last 12 reported months
10M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000076044W-14 DisposalActive17,1431,0004,735–5,280

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 269,731 · prior 12 75,291(+258%)

050K100K150K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42331331, documented in the API reference.