WELL · 42-423-31373 · DISTRICT 6

Walker Ross Unit #1

Plugged

Smith County · Lane Chapel N. (Paluxy B) field  · Vertical

Walker Ross Unit #1 (API 42-423-31373) is a plugged well in Smith County, plugged December 23, 1999, last operated by Gunn Oil Company.

The RRC has issued one drilling permit (amended once), issued May 20, 1992, permitted to 6,700 ft.

It was permitted by Weeks Exploration Company and has since transferred to Gunn Oil Company on the wellbore schedule.

Completion filings report 3 formation tops, including Woodbine, Buda, Paluxy.

Operator of record

Gunn Oil Company

Permitted by Weeks Exploration Company; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 743 permits on file · (940) 256-3330

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGunn Oil Company
Production reportsWeeks Exploration Companythrough May 1993
Latest permitWeeks Exploration CompanyMay 20, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
2
permits on file
May 20, 1992
last permit issued
Jun 27, 1992
completed
0
cumulative oil, bbl
48.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 27, 1992
Shut in
—
Plugged
Dec 23, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walker, Ross Unit G-6-144061Lane Chapel, N. (Paluxy B)Gunn Oil Company1048.1KJan 1993 – Dec 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Weeks Exploration CompanyJan 1993 → May 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
398989-98DrillWeeks Exploration CompanyJan 5, 1993May 20, 1992May 21, 19926,700
398989-99DrillWeeks Exploration CompanyMay 5, 1992May 20, 1992—6,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-144061————

Formation tops

As filed on W-2/G-1. Subsea from 449 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine4,405-3,956
Buda5,035-4,586
Paluxy6,420-5,971

Perforations

Perforated and open-hole intervals.

FromToType
6,4956,500Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,10911390 S
5.56,7007.875630 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 1993Aug 28, 1992Yes
00Mar 3, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42331373, documented in the API reference.