WELL · 42-423-31424 · DISTRICT 6

Cobb #2

Plugged

Smith County · Chapel Hill (Paluxy 5800) field  · Vertical

Cobb #2 (API 42-423-31424) is a plugged well in Smith County, plugged October 4, 2011, last operated by Thomas Operating Ltd. CO..

The RRC has issued 2 drilling permits (amended once) between 1994 and 1995, permitted to 7,800 ft.

It was permitted by Thomas, B. K. and has since transferred to Thomas Operating Ltd. CO. on the wellbore schedule.

Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Woodbine, Paluxy.

Its 3 leases have reported 420 barrels of oil and 110K mcf of gas since June 1994, last reporting in March 2012. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Thomas Operating Ltd. Co.

Permitted by Thomas, B. K.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 4, 2025 · 8 permits on file · (214) 708-3047

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleThomas Operating Ltd. Co.
Production reportsThomas Operating Ltd. Co.through Sep 2011
Latest permitThomas, B. K.Oct 26, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,800
total depth, ft
3
permits on file
Oct 26, 1995
last permit issued
—
completed
420
cumulative oil, bbl
110K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1994 THROUGH Mar 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 4, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cobb G-6-183814Chapel Hill (Paluxy 5800)Thomas Operating Ltd. Co.1035.2KAug 2001 – Mar 2012
Cobb O-6-13703Chapel Hill (Paluxy 5800)Thomas Operating Ltd. Co.142023KSep 1997 – Jan 2006
Cobb G-6-150418Chapel Hill (Paluxy 5800)Thomas, B. K.1052.1KJun 1994 – Sep 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thomas, B. K.Jun 1994 → Nov 1997
  2. 2Thomas Operating Ltd. Co.Oct 1998 → Sep 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
441267-98RecompletionThomas, B. K.Jun 13, 1997Oct 26, 1995Jun 26, 19975,933
441267-99RecompletionThomas, B. K.Oct 25, 1995Oct 26, 1995—5,953
423492-99DrillThomas, B. K.May 2, 1994May 5, 1994May 24, 19947,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-150418————
—— G-6-183814————
—— O-6-13703————

Formation tops

As filed on W-2/G-1. Subsea from 400 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap2,774-2,374
Austin Chalk3,682-3,282
Woodbine3,905-3,505
Paluxy5,526-5,126

Perforations

Perforated and open-hole intervals.

FromToType
5,7665,774Perforated
5,7685,774Perforated
5,7705,774Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,22511293 S
5.55,9537.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 19, 2001Aug 8, 2001—
00Aug 23, 2001——
00Dec 3, 1997Oct 2, 1997—
00Oct 27, 1997——
00Aug 25, 1994Jun 16, 1994Yes
00Aug 11, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42331424, documented in the API reference.