WELL · 42-423-31484 · DISTRICT 6
Campbell Earl #1
Smith County · Molly-Jane (Paluxy) field · Shut IN · Vertical
Campbell Earl #1 (API 42-423-31484) is a well in Smith County operated by Cinron Energy LLC, completed April 17, 1997 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued February 28, 1997, permitted to 7,850 ft.
It was permitted by Magna Oil & Gas Corporation and has since transferred to Cinron Energy LLC on the wellbore schedule.
Its lease has reported 15.5K barrels of oil and 28 mcf of gas since May 1997, last reporting in July 2026.
Operator of record
Permitted by Magna Oil & Gas Corporation; the EWA schedule now lists a different operator.
Arp, TX · P-5 Y, filed Dec 4, 2025 · (903) 941-6741
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cinron Energy LLC |
| Production reports | Guardian Energy Operating Co LLCthrough Jan 2019 |
| Latest permit | Magna Oil & Gas CorporationFeb 28, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,850
- total depth, ft
- 1
- permits on file
- Feb 28, 1997
- last permit issued
- Apr 17, 1997
- completed
- 15.5K
- cumulative oil, bbl
- 28
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1997 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 17, 1997
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Campbell, Earl O-6-13682 | Molly-Jane (Paluxy) | Cinron Energy, LLC | 1 | 15.5K | 28 | May 1997 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Magna Oil & Gas CorporationMay 1997 → Aug 2002
- 2Fortune Operating CompanyDec 2002 → May 2007
- 3Wtxr Operating (Texas), Inc.Aug 2017 → Apr 2018
- 4Guardian Energy Operating Co LLCJul 2018 → Jan 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 459299-99 | Drill | Magna Oil & Gas Corporation | Feb 28, 1997 | Feb 28, 1997 | Mar 12, 1997 | 7,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-13682 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,583 | 7,585 | Perforated |
| 7,588 | 7,591 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,700 | 11 | 450 S |
| 5.5 | 7,716 | 7.875 | 685 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 19, 1997 | May 28, 1997 | Yes |
| 00 | Jul 30, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-31484 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-31484 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42331484, documented in the API reference.