WELL · 42-423-31612 · DISTRICT 6

Sand Flat West(paluxy B ) Unit #3I

Plugged

Smith County · Sand Flat W. (Paluxy B ) field  · Directional · Sidetrack

Sand Flat West(Paluxy B ) Unit #3I (API 42-423-31612) is a plugged well in Smith County, plugged December 13, 2024, last operated by Goldston Oil Corporation.

The RRC has issued one drilling permit (amended once), issued January 13, 2003, permitted to 7,750 ft.

Completion filings report 5 formation tops, including Nacatoch, Austin Chalk, Woodbine, Buda.

Its lease has reported 793K barrels of oil and 90.2K mcf of gas since October 2002, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Goldston Oil Corporation

Houston, TX · P-5 Y, filed Feb 4, 2026 · 265 permits on file · (800) 268-2661

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGoldston Oil Corporation
Production reportsGoldston Oil Corporationthrough Apr 2026
Latest permitGoldston Oil Corp.Jan 13, 2003
7,750
total depth, ft
2
permits on file
Jan 13, 2003
last permit issued
Aug 23, 2003
completed
793K
cumulative oil, bbl
90.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 23, 2003
Shut in
—
Plugged
Dec 13, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sand Flat, West(paluxy "B") Unit O-6-14190Sand Flat, W. (Paluxy "B")Goldston Oil Corporation5793K90.2KOct 2002 – Jul 2026

Oil, barrels lease total

Last 12 months 8,487 · prior 12 9,100(-7%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 4,380 · prior 12 4,356(+1%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Goldston Oil CorporationOct 2002 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
527249-98Drill · sidetrackGoldston Oil Corp.Apr 10, 2003Jan 13, 2003—7,750
527249-99DrillGoldston Oil Corp.Jan 13, 2003Jan 13, 2003Mar 24, 20037,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-14190————

Formation tops

As filed on W-2/G-1. Subsea from 622 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch2,636-2,014
Austin ChalkAUSTIN CHALK (BASE)4,768-4,146
Woodbine5,052-4,430
Buda5,804-5,182
Paluxy7,370-6,748

Perforations

Perforated and open-hole intervals.

FromToType
7,4607,470Perforated
7,4807,487Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,69711540 S
4.57,6357.875560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 13, 2003Sep 17, 2003—
00Oct 9, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.83M
bbl, all reported
Oct 2024
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092733H-1 InjectionPlugged Dec 18, 20245003,0007,460–7,487

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120232024

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42331612, documented in the API reference.