WELL · 42-423-31633 · DISTRICT 6
Sand Flat West(paluxy B ) Unit #1I
Smith County · Sand Flat W. (Paluxy B ) field · Shut IN · Vertical
Sand Flat West(Paluxy B ) Unit #1I (API 42-423-31633) is a well in Smith County operated by Goldston Oil Corporation, completed August 21, 2013 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued March 27, 2003, permitted to 7,600 ft.
Completion filings report 5 formation tops, including Nacatoch, Austin Chalk, Woodbine, Buda.
Its lease has reported 793K barrels of oil and 90.2K mcf of gas since October 2002, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit.
Operator of record
Houston, TX · P-5 Y, filed Feb 4, 2026 · 265 permits on file · (800) 268-2661
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Goldston Oil Corporation |
| Production reports | Goldston Oil Corporationthrough Apr 2026 |
| Latest permit | Goldston Oil Corp.Mar 27, 2003 |
- 7,600
- total depth, ft
- 1
- permits on file
- Mar 27, 2003
- last permit issued
- Aug 21, 2013
- completed
- 793K
- cumulative oil, bbl
- 90.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 21, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sand Flat, West(paluxy "B") Unit O-6-14190 | Sand Flat, W. (Paluxy "B") | Goldston Oil Corporation | 5 | 793K | 90.2K | Oct 2002 – Jul 2026 |
Oil, barrels lease total
Last 12 months 8,487 · prior 12 9,100(-7%)
Gas, mcf lease total
Last 12 months 4,380 · prior 12 4,356(+1%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Goldston Oil CorporationOct 2002 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 530067-99 | Drill | Goldston Oil Corp. | Mar 27, 2003 | Mar 27, 2003 | Apr 23, 2003 | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-14190 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 604 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Nacatoch | 2,620 | -2,016 |
| Austin ChalkAUSTIN CHALK (BASE) | 4,750 | -4,146 |
| Woodbine | 5,050 | -4,446 |
| Buda | 5,800 | -5,196 |
| Paluxy | 7,280 | -6,676 |
| Austin ChalkAUSTIN CHALK (BASE) | — | — |
| Buda | — | — |
| Nacatoch | — | — |
| Paluxy | — | — |
| Woodbine | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,354 | 7,362 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,840 | 12.25 | 690 S |
| 5.5 | 7,493 | 8.75 | 670 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 26, 2025 | Jul 31, 2024 | — |
| 00 | Oct 15, 2003 | Aug 25, 2003 | — |
| 00 | Sep 4, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-31633 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-31633 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 205K
- bbl, all reported
- Oct 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000092731 | H-1 Injection | Active | 500 | 3,000 | 7,353–7,366 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42331633, documented in the API reference.