WELL · 42-423-31771 · DISTRICT 6
Grace #1
Smith County · Flint East (Paluxy) field · Directional
Grace #1 (API 42-423-31771) is a plugged well in Smith County, plugged October 14, 2014, last operated by Roosth Production CO..
The RRC has issued one drilling permit (amended twice), issued April 29, 2004, permitted to 8,000 ft.
Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Woodbine, Paluxy.
Its lease has reported 199 barrels of oil since July 2004, last reporting in June 2015. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Tyler, TX · P-5 Y, filed Oct 4, 2019 · 21 permits on file · (903) 593-8333
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Roosth Production Co. |
| Production reports | Roosth Production Co.through Apr 2012 |
| Latest permit | Roosth Production Co.Apr 29, 2004 |
- 8,000
- total depth, ft
- 3
- permits on file
- Apr 29, 2004
- last permit issued
- Jul 5, 2004
- completed
- 199
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2004 THROUGH Jun 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 5, 2004
- Shut in
- —
- Plugged
- Oct 14, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Grace O-6-14467 | Flint, East (Paluxy) | Roosth Production Co. | 2 | 199 | 0 | Jul 2004 – Jun 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cape Operating, Inc.Sep 2004 → Sep 2004
- 2Roosth Production Co.Oct 2011 → Apr 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 545111-97 | Drill | Roosth Production Co. | Mar 17, 2010 | Apr 29, 2004 | May 15, 2004 | 7,583 |
| 545111-98 | Drill | Cape Operating, Inc. | Aug 24, 2005 | Apr 29, 2004 | May 15, 2004 | 8,000 |
| 545111-99 | Drill | Cape Operating, Inc. | Apr 29, 2004 | Apr 29, 2004 | May 15, 2004 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-14467 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 523 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 3,662 | -3,139 |
| Austin ChalkBASE OF AUSTIN CHALK | 4,901 | -4,378 |
| WoodbineTOP OF WOODBINE | 5,190 | -4,667 |
| Paluxy | 7,463 | -6,940 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,512 | 7,532 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,018 | — | 521 S |
| 5.5 | 7,583 | 7.875 | 287 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 2010 | Mar 15, 2007 | Yes |
| 00 | Jan 26, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-31771 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-31771 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42331771, documented in the API reference.