WELL · 42-423-31873 · DISTRICT 6
Davis Sharon #1
Smith County · Overton (Cotton Valley Sand) field · Temp Abandoned · Vertical
Davis Sharon #1 (API 42-423-31873) is a well in Smith County operated by Eagle Oil & Gas CO., completed May 27, 2006 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued March 25, 2005, permitted to 12,500 ft.
It was permitted by Wagner & Brown, Ltd. and has since transferred to Eagle Oil & Gas CO. on the wellbore schedule.
Completion filings report 3 formation tops, including Glen Rose, Rodessa, Travis Peak.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Wagner & Brown, Ltd.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jan 4, 2026 · 347 permits on file · (940) 781-0704
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eagle Oil & Gas Co. |
| Production reports | C. W. Resources, Inc.through Jul 2020 |
| Latest permit | Wagner & Brown, Ltd.Mar 25, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 1
- permits on file
- Mar 25, 2005
- last permit issued
- May 27, 2006
- completed
- 0
- cumulative oil, bbl
- 532K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 27, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis, Sharon G-6-221457 | Overton (Cotton Valley Sand) | Eagle Oil & Gas Co. | 1 | 0 | 532K | May 2006 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1C. W. Resources, Inc.May 2006 → Jul 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 553996-99 | Drill | Wagner & Brown, Ltd. | Nov 22, 2004 | Mar 25, 2005 | Mar 28, 2006 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-221457 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 437 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen Rose | 4,497 | -4,060 |
| Rodessa | 7,596 | -7,159 |
| Travis Peak | 8,430 | -7,993 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,715 | 11,832 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,035 | 12.25 | 910 S |
| 5.5 | 12,045 | 7.875 | 1,450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 7, 2007 | Jun 30, 2006 | Yes |
| 00 | Nov 15, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-31873 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-31873 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42331873, documented in the API reference.