WELL · 42-423-32008 · DISTRICT 6
Mann et AL #1
Smith County · Chapel Hill (Cotton Valley) field · Vertical
Mann ET AL #1 (API 42-423-32008) is a plugged well in Smith County, plugged August 15, 2007, last operated by Petro-Hunt L.L.C..
The RRC has issued 2 drilling permits between 2005 and 2006, permitted to 13,300 ft.
Completion filings report 5 formation tops, including Goodland, Paluxy, Pettit, Travis Peak.
Operator of record
Dallas, TX · P-5 Y, filed Jun 4, 2026 · 104 permits on file · (903) 752-6321
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petro-Hunt L.L.C. |
| Production reports | Petro-Hunt, L.L.C.through Jul 2007 |
| Latest permit | Petro-Hunt, L.L.C.Dec 5, 2006 |
- 13,300
- total depth, ft
- 2
- permits on file
- Dec 5, 2006
- last permit issued
- Nov 8, 2006
- completed
- 0
- cumulative oil, bbl
- 11.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Aug 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 8, 2006
- Shut in
- —
- Plugged
- Aug 15, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mann et AL G-6-223615 | Chapel Hill (Cotton Valley) | Petro-Hunt, L.L.C. | 1 | 0 | 11.4K | Nov 2006 – Aug 2007 |
| Mann et AL G-6-221852 | Wildcat | Petro-Hunt, L.L.C. | 1 | 0 | 214 | Feb 2006 – Nov 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petro-Hunt, L.L.C.Oct 2006 → Jul 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 629923-99 | Recompletion | Petro-Hunt, L.L.C. | Dec 4, 2006 | Dec 5, 2006 | Jan 21, 2006 | 13,300 |
| 606255-99 | Drill | Petro-Hunt, L.L.C. | Sep 13, 2005 | Sep 14, 2005 | Jan 21, 2006 | 13,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-221852 | — | — | — | — |
| — | — G-6-223615 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 414 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| GoodlandGOODLAND LIME | 5,901 | -5,487 |
| Paluxy | 6,023 | -5,609 |
| Pettit | 8,608 | -8,194 |
| Travis Peak | 8,784 | -8,370 |
| Cotton Valley | 10,719 | -10,305 |
| Cotton ValleyCOTTON VALLEY TAYLOR | 12,038 | -11,624 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,960 | 11,974 | Perforated |
| 11,978 | 11,990 | Perforated |
| 12,020 | 12,038 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,541 | 12.25 | 1,233 S |
| 4.5 | 12,492 | 8.75 | 1,408 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 19, 2007 | Dec 8, 2006 | Yes |
| 00 | Mar 15, 2007 | Jul 31, 2006 | Yes |
| 00 | Jan 5, 2007 | — | — |
| 00 | Nov 21, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-32008 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-32008 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42332008, documented in the API reference.