WELL · 42-423-32157 · DISTRICT 6
Willingham-Daniels #1
Smith County · Tyler (Paluxy Seg 2) field · Vertical
Willingham-Daniels #1 (API 42-423-32157) is a plugged well in Smith County, plugged June 7, 2013, last operated by Roosth Production CO..
The RRC has issued 2 drilling permits (amended once) between 2006 and 2009, permitted to 11,000 ft.
Completion filings report 6 formation tops, including Paluxy, Glen Rose, Rodessa, Rosessa Glovd.
Its 2 leases have reported 2.75K barrels of oil and 3.54K mcf of gas since April 2007, last reporting in October 2013. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Tyler, TX · P-5 Y, filed Oct 4, 2019 · 21 permits on file · (903) 593-8333
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Roosth Production Co. |
| Production reports | Roosth Production Co.through Jun 2013 |
| Latest permit | Roosth Production Co.Jul 27, 2009 |
- 11,000
- total depth, ft
- 3
- permits on file
- Jul 27, 2009
- last permit issued
- Jul 1, 2009
- completed
- 2.75K
- cumulative oil, bbl
- 3.54K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Oct 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 1, 2009
- Shut in
- —
- Plugged
- Jun 7, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Willingham-Daniels O-6-14914 | Tyler (Paluxy Seg 2) | Roosth Production Co. | 1 | 2.75K | 0 | Jul 2009 – Oct 2013 |
| K & M E #1 Willingham-Daniels G-6-234044 | Wildcat | Roosth Production Co. | 1 | 0 | 3.54K | Apr 2007 – Jun 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kraker & Martin Energy, L.L.C.May 2007 → Sep 2008
- 2Roosth Production Co.Jul 2009 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 683245-98 | Recompletion | Roosth Production Co. | Sep 14, 2009 | Jul 27, 2009 | Jun 12, 2009 | 7,900 |
| 683245-99 | Recompletion | Roosth Production Co. | Jul 20, 2009 | Jul 27, 2009 | — | 7,900 |
| 629509-99 | Drill | Kraker & Martin Energy, L.L.C. | Nov 27, 2006 | Dec 7, 2006 | Mar 25, 2007 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-234044 | — | — | — | — |
| — | — O-6-14914 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 420 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,510 | 7,525 | Perforated |
| 10,530 | 10,544 | Perforated |
| 10,564 | 10,572 | Perforated |
| 10,564 | 10,752 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,210 | 12.25 | 800 S |
| 5.5 | 10,700 | 8.75 | 440 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 16, 2010 | Aug 25, 2009 | Yes |
| 00 | Oct 13, 2009 | — | — |
| 00 | Apr 28, 2008 | Mar 7, 2008 | — |
| 00 | Apr 17, 2008 | Dec 18, 2007 | Yes |
| 00 | Mar 27, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-423-32157 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-423-32157 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42332157, documented in the API reference.