WELL · 42-423-32176 · DISTRICT 6

South Tyler Paluxy Waterflood UT #1

N

Smith County · Tyler field  · Directional

South Tyler Paluxy Waterflood UT #1 (API 42-423-32176) is a well in Smith County operated by Petrohawk Operating Company, completed June 18, 2008.

The RRC has issued one drilling permit (amended once), issued March 1, 2007, permitted to 8,300 ft.

Completion filings report one formation top, including Paluxy.

Its 2 leases have reported 428K barrels of oil since May 2007, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 580K barrels injected in the 12 months reported through October 2025.

Operator of record

Petrohawk Operating Company

Houston, TX · P-5 Y, filed Oct 13, 2017 · 1,334 permits on file · (877) 452-4294

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetrohawk Operating Company
Production reportsLinder, John Operating Co., LLCthrough Apr 2026
Latest permitPetrohawk Operating CompanyMar 1, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,300
total depth, ft
2
permits on file
Mar 1, 2007
last permit issued
Jun 18, 2008
completed
428K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 18, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
South Tyler Paluxy Unit O-6-14664TylerLinder, John Operating Co., LLC8428K0May 2007 – Jul 2026
South Tyler Paluxy Waterflood UT O-6-14840TylerPetrohawk Operating Company100Jun 2008 – Dec 2009

Oil, barrels lease total

Last 12 months 29,168 · prior 12 26,962(+8%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Petrohawk Operating CompanyMay 2007 → Sep 2010
  2. 2Enervest Operating, L.L.C.Oct 2010 → Mar 2017
  3. 3Linder, John Operating Co., LLCApr 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
634109-98DrillPetrohawk Operating CompanyJul 1, 2008Mar 1, 2007Mar 2, 20087,900
634109-99DrillPetrohawk Operating CompanyFeb 23, 2007Mar 1, 2007Mar 2, 20088,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-14664————
—— O-6-14840————

Formation tops

As filed on W-2/G-1. Subsea from 578 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy8,000-7,422

Perforations

Perforated and open-hole intervals.

FromToType
8,0448,122Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,97712.25700 S
5.58,2418.75435 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 2009Jul 1, 2008Yes
00Jan 27, 2009Jul 1, 2008Yes
00Dec 19, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

580K
bbl, last 12 reported months
8.32M
bbl, all reported
Oct 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000097589H-1 InjectionActive3,0003,8007,650–7,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 580,192 · prior 12 622,604(-7%)

020K40K60K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42332176, documented in the API reference.