WELL · 42-423-32264 · DISTRICT 6

Coker et AL #1

Plugged

Smith County  · Directional

Coker ET AL #1 (API 42-423-32264) is a plugged well in Smith County, plugged December 28, 2012, last operated by Maximus Operating, Ltd..

The RRC has issued 2 drilling permits (amended once) between 2009 and 2012, permitted to 11,700 ft.

Operator of record

Maximus Operating, Ltd.

Kilgore, TX · P-5 Y, filed Aug 4, 2025 · 107 permits on file · (903) 753-0941

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMaximus Operating, Ltd.Nov 28, 2012
11,700
total depth, ft
3
permits on file
Nov 28, 2012
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 28, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
752027-98ReenterMaximus Operating, Ltd.Dec 7, 2012Nov 28, 2012Nov 29, 20129,000
752027-99ReenterMaximus Operating, Ltd.Nov 23, 2012Nov 28, 2012—9,000
683819-99DrillOps Group LimitedAug 4, 2009Aug 6, 2009Oct 14, 200911,700

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42332264, documented in the API reference.