WELL · 42-427-00762 · DISTRICT 4

DE Lopez, C. V. -A- #2

N

Starr County  · Vertical

De Lopez, C. V. -A- #2 (API 42-427-00762) is a former disposal or injection well in Starr County, last operated by Sun Expl. & Prod. CO.-Corpus; its UIC permit is no longer active.

The RRC has issued 3 drilling permits between 1980 and 1985, permitted to 10,502 ft.

Completion filings report 4 formation tops, including (Lopez), Lopez, (7000), 7000.

Operator of record

Sun Expl. & Prod. Co.-Corpus

Houston, TX · P-5 New · 1,290 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSun Expl. & Prod. Co.-CorpusDec 2, 1985
10,502
total depth, ft
3
permits on file
Dec 2, 1985
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
DE Lopez, C. V. -A- G-4-119109LA Reforma (Lopez)Bellows Operating Co., L. C.100Jan 1993 – Oct 2019

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
291478-99RecompletionSun Expl. & Prod. Co.-CorpusDec 2, 1985Dec 2, 1985—10,502
156229-99RecompletionSun Expl. & Prod. Co.-CorpusApr 8, 1982Apr 8, 1982Nov 29, 198210,502
69198-99RecompletionSun Expl. & Prod. Co.-CorpusJan 10, 1980Jan 10, 1980—8,417

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-119109————

Formation tops

As filed on W-2/G-1. Subsea from 299 ft elevation.Download CSV →

FormationMD ftSubsea
(Lopez)5,126-4,827
Lopez5,126-4,827
(7000)6,684-6,385
70006,684-6,385

Perforations

Perforated and open-hole intervals.

FromToType
5,1265,146Perforated
5,1425,146Perforated
7,0567,080Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,00517.5750 S
10.3751,00517.5750 S
2.8756,918——
7.6257,0569.875575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 2004Dec 15, 2003—
00Sep 21, 1989Jul 20, 1989—
00Dec 19, 1985Dec 9, 1985Yes
00Dec 18, 1985Dec 4, 1985Yes
00Dec 11, 1985——
00Jan 12, 1984Sep 25, 1980—
00Jan 12, 1984Apr 27, 1971—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.43M
bbl, all reported
Nov 2019
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000063235H-1 InjectionPlugged Nov 12, 20195,0001,8005,142–5,146

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120182019

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42700762, documented in the API reference.