WELL · 42-427-05092 · DISTRICT 4
McLean, Marrs #20
Starr County · Vertical
Mclean, Marrs #20 (API 42-427-05092) is a permitted well in Starr County filed by Opex Energy, LLC; no completion report is on file yet.
The RRC has issued one drilling permit, issued May 10, 2005, permitted to 4,653 ft.
Its 2 leases have reported 14.8K barrels of oil and 126K mcf of gas since January 1993, last reporting in November 2018. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Feb 8, 2008 · 19 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Continental Operating Co.through Jun 2016 |
| Latest permit | Opex Energy, LLCMay 10, 2005 |
- 4,653
- total depth, ft
- 1
- permits on file
- May 10, 2005
- last permit issued
- —
- completed
- 14.8K
- cumulative oil, bbl
- 126K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McLean, Marrs G-4-219773 | Lockhart (Yegua F Seg 2) | Continental Operating Co. | 1 | 0 | 48.4K | May 2006 – Nov 2018 |
| McLean, Marrs O-4-7849 | Lockhart (Yegua F Seg 2) | Opex Energy, LLC | 1 | 14.8K | 77.9K | Jan 1993 – Oct 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1South Texas Limited PartnershipJan 1993 → Feb 1994
- 2Washington Energy Expl., Inc.Mar 1994 → Jul 1994
- 3Cabot Oil & Gas Production Corp.Aug 1994 → Feb 1996
- 4Cabot Oil & Gas CorporationMar 1996 → Jan 1997
- 5Ceniza Petroleum, Inc.Feb 1997 → Jun 2002
- 6FredcoJul 2002 → Feb 2003
- 7White Oak Operating Company LLCMar 2003 → Jun 2004
- 8Opex Energy, LLCJul 2004 → Mar 2007
- 9Exploration Company, TheApr 2007 → Jun 2007
- 10Txco Resources Inc.Jul 2007 → Jul 2008
- 11Continental Operating Co.Aug 2008 → Jun 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600328-99 | Recompletion | Opex Energy, LLC | May 6, 2005 | May 10, 2005 | — | 4,653 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-219773 | — | — | — | — |
| — | — O-4-7849 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,358 | 4,360 | Perforated |
| — | 4,060 | Perforated |
| — | 4,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 214 | 12.5 | 100 S |
| 5.5 | 4,557 | 7.875 | 160 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 12, 2007 | Jun 9, 2006 | — |
| 00 | Oct 4, 2006 | — | — |
| 00 | Jan 12, 1984 | Aug 11, 1971 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-05092 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-05092 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42705092, documented in the API reference.