WELL · 42-427-30318 · DISTRICT 4
Garza Ruben #1
Starr County · Sun North (5950 Frio) field · Vertical
Garza Ruben #1 (API 42-427-30318) is a well in Starr County operated by Texas Oil & Gas Corp., completed January 1, 1972.
The RRC has issued 3 drilling permits between 1978 and 1985, permitted to 7,000 ft.
It was permitted by Txo Production Corp. and has since transferred to Texas Oil & Gas Corp. on the wellbore schedule.
Completion filings report 2 formation tops, including Frio, Vicksburg.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Sep 15, 1987 · 1,344 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texas Oil & Gas Corp. |
| Production reports | none |
| Latest permit | TXO Production Corp.Jan 30, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 3
- permits on file
- Jan 30, 1985
- last permit issued
- Jan 1, 1972
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 1, 1972
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Garza, Ruben G-4-117448 | Sun, North (C-3-C) | Texas, Les & Co. | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
| — O-4-10081 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 265539-99 | Recompletion | TXO Production Corp. | Jan 24, 1985 | Jan 30, 1985 | — | 5,450 |
| 161524-99 | Recompletion | TXO Production Corp. | May 21, 1982 | May 21, 1982 | — | 7,000 |
| 23736-99 | Recompletion | Texas Oil & Gas Corp. | May 8, 1978 | May 8, 1978 | — | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-117448 | — | — | — | — |
| — | — O-4-10081 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 291 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,480 | 4,488 | Perforated |
| 4,892 | 4,896 | Perforated |
| 5,918 | 5,925 | Perforated |
| — | 5,549 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,503 | 12.25 | 670 S |
| 2.375 | 4,830 | — | — |
| 4.5 | 6,696 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 30, 1985 | Jul 26, 1985 | — |
| 00 | Aug 8, 1985 | — | — |
| 00 | Jan 12, 1984 | Jun 7, 1982 | — |
| 00 | Jan 12, 1984 | Aug 10, 1978 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-30318 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-30318 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42730318, documented in the API reference.