WELL · 42-427-30394 · DISTRICT 4

Samano #2

Plugged

Starr County · Yturria (4740 E Gas) field  · Vertical

Samano #2 (API 42-427-30394) is a plugged well in Starr County, plugged January 7, 2003, last operated by Tana Oil & Gas Corporation.

The RRC has issued 3 drilling permits between 1977 and 1997, permitted to 4,910 ft.

It was permitted by Starco Exploration, Inc. and has since transferred to Tana Oil & Gas Corporation on the wellbore schedule.

Completion filings report one formation top, including Frio.

Operator of record

Tana Oil & Gas Corporation

Permitted by Starco Exploration, Inc.; the EWA schedule now lists a different operator.

Irving, TX · P-5 Y, filed Sep 15, 1989 · 229 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTana Oil & Gas Corporation
Production reportsEL Paso Production Oil & Gas Co.through Aug 2001
Latest permitStarco Exploration, Inc.Jun 27, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,910
total depth, ft
3
permits on file
Jun 27, 1997
last permit issued
—
completed
0
cumulative oil, bbl
116K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 7, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Samano G-4-163650Yturria (Frio 4070)EL Paso Production Oil & Gas Co.10116KJun 1997 – Jan 2003
Samano O-4-9074Yturria (4530,E)Starco Exploration, Inc.100Jan 1993 – Aug 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Starco Exploration, Inc.Jun 1997 → Apr 1998
  2. 2Coastal Oil & Gas CorporationMay 1998 → Jun 2001
  3. 3EL Paso Production Oil & Gas Co.Aug 2001 → Aug 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
464377-99RecompletionStarco Exploration, Inc.Jun 30, 1997Jun 27, 1997Jun 18, 19974,910
17369-99RecompletionTana Oil & Gas Corp.Jan 31, 1978Jan 31, 1978—4,910
5000-99RecompletionIntegral Petroleum CorporationAug 9, 1977Aug 9, 1977—4,910

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-163650————
—— O-4-9074————

Formation tops

As filed on W-2/G-1. Subsea from 331 ft elevation.Download CSV →

FormationMD ftSubsea
Frio1330

Perforations

Perforated and open-hole intervals.

FromToType
4,0594,070Perforated
4,7264,735Perforated
—4,524Perforated
—4,626Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62557712.25300 S
8.62558812.25300 S
4.54,8857.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 21, 1997Jul 3, 1997Yes
00Jul 31, 1997——
00Jan 12, 1984Apr 10, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091246W-14 DisposalPlugged Feb 3, 20036,0001,4152,830–3,200

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42730394, documented in the API reference.