WELL · 42-427-31961 · DISTRICT 4
Guerra J. C. et AL #1
Starr County · Val-Max field · Vertical
Guerra J. C. ET AL #1 (API 42-427-31961) is a plugged well in Starr County, plugged February 9, 1995, last operated by Wayne E. Glenn Associates Inc..
The RRC has issued one drilling permit, issued November 7, 1984, permitted to 4,100 ft.
It was permitted by Eads Operating CO. and has since transferred to Wayne E. Glenn Associates Inc. on the wellbore schedule.
Completion filings report one formation top, including Frio.
Its lease has reported 61.9K barrels of oil and 6.98K mcf of gas since January 1993, last reporting in April 2015. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Wayne E. Glenn Associates Inc.
Permitted by Eads Operating Co.; the EWA schedule now lists a different operator.
Dickinson, TX · P-5 Y, filed Apr 2, 2015 · (281) 734-0863
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wayne E. Glenn Associates Inc. |
| Production reports | Wayne E. Glenn Associates, Inc.through Jan 2013 |
| Latest permit | Eads Operating Co.Nov 7, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,100
- total depth, ft
- 1
- permits on file
- Nov 7, 1984
- last permit issued
- Apr 22, 1985
- completed
- 61.9K
- cumulative oil, bbl
- 6.98K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 22, 1985
- Shut in
- —
- Plugged
- Feb 9, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Guerra, J. C. et AL O-4-10792 | Val-Max | Wayne E. Glenn Associates, Inc. | 2 | 61.9K | 6.98K | Jan 1993 – Apr 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kelley Oil CorporationJan 1993 → Jun 1994
- 2Roberson, F. W. Jr.Jul 1994 → Oct 1995
- 3Glenn, Wayne E. & Assoc., Inc.Nov 1995 → Jun 2005
- 4Glenn, Wayne E. Associates Inc.Jul 2005 → Jun 2008
- 5Wayne E. Glenn Associates, Inc.Jul 2008 → Jan 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 256971-99 | Drill | Eads Operating Co. | Nov 2, 1984 | Nov 7, 1984 | Dec 3, 1984 | 4,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-10792 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 407 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,574 | 3,588 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 382 | 12.25 | 170 S |
| 4.5 | 3,707 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 1, 1985 | May 10, 1985 | — |
| 00 | Jun 25, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-31961 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-31961 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42731961, documented in the API reference.