WELL · 42-427-32290 · DISTRICT 4
Doyno #3
Starr County · Kitty Hawk (Frio 800) field · Vertical
Doyno #3 (API 42-427-32290) is a plugged well in Starr County, plugged December 6, 2016, last operated by Orphan Wells LLC.
The RRC has issued one drilling permit (amended once), issued August 29, 1988, permitted to 1,200 ft.
It was permitted by Wright Brothers Energy, Inc. and has since transferred to Orphan Wells LLC on the wellbore schedule.
Operator of record
Permitted by Wright Brothers Energy, Inc.; the EWA schedule now lists a different operator.
Palmhurst, TX · P-5 Y, filed May 29, 2025 · (956) 890-3874
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Orphan Wells LLC |
| Production reports | Orphan Wells, LLCthrough Sep 2011 |
| Latest permit | Wright Brothers Energy, Inc.Aug 29, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,200
- total depth, ft
- 2
- permits on file
- Aug 29, 1988
- last permit issued
- Sep 2, 1988
- completed
- 0
- cumulative oil, bbl
- 57K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 2, 1988
- Shut in
- —
- Plugged
- Dec 6, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Doyno G-4-129196 | Kitty Hawk (Frio 800) | Orphan Wells, LLC | 1 | 0 | 57K | Jan 1993 – Nov 2016 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Falcon Production Co.Jan 1993 → Dec 1996
- 2Wright Brothers Energy, Inc.Jan 1997 → Mar 2002
- 3DA Crowe & Associates, IncApr 2002 → Nov 2004
- 4White Oak Operating Company LLCDec 2004 → Sep 2006
- 5McDonald & Johnson Resources,llcOct 2006 → Dec 2008
- 6Great Bay Operations, LLCJan 2009 → Jan 2009
- 7Momentum Production Corp.May 2009 → Feb 2011
- 8Orphan Wells, LLCMar 2011 → Sep 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 350591-98 | Drill | Wright Brothers Energy, Inc. | Sep 8, 1988 | Aug 29, 1988 | — | 800 |
| 350591-99 | Drill | Wright Brothers Energy, Inc. | Aug 26, 1988 | Aug 29, 1988 | — | 1,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-129196 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 788 | 796 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.875 | 846 | 6.75 | 207 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 2, 1989 | Nov 22, 1988 | Yes |
| 00 | Dec 30, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-32290 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-32290 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42732290, documented in the API reference.