WELL · 42-427-32615 · DISTRICT 4
LA Brisa Ranch 907 #3
Starr County · Rincon (H) field · Vertical
La Brisa Ranch 907 #3 (API 42-427-32615) is a plugged well in Starr County, plugged November 18, 2021, last operated by Trap Rock Oil Ltd..
The RRC has issued 2 drilling permits between 1993 and 2008, permitted to 6,000 ft.
Operator of record
Houston, TX · P-5 Y, filed Sep 4, 2025 · 41 permits on file · (617) 686-0238
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trap Rock Oil Ltd. |
| Production reports | Trap Rock Oil, Ltd.through Mar 2010 |
| Latest permit | Trap Rock Oil, Ltd.Nov 19, 2008 |
- 6,000
- total depth, ft
- 2
- permits on file
- Nov 19, 2008
- last permit issued
- Jul 9, 2009
- completed
- 0
- cumulative oil, bbl
- 28.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1994 THROUGH Nov 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 9, 2009
- Shut in
- —
- Plugged
- Nov 18, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| LA Brisa Ranch 907 G-4-147877 | Rincon (H) | Trap Rock Oil, Ltd. | 1 | 0 | 28.1K | Jan 1994 – Nov 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Trap Rock Oil, Ltd.Aug 2009 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 675090-99 | Recompletion | Trap Rock Oil, Ltd. | Nov 17, 2008 | Nov 19, 2008 | Jul 6, 2009 | 3,600 |
| 415711-99 | Drill | Glenn, Wayne E. & Assoc., Inc. | Sep 7, 1993 | Sep 9, 1993 | Nov 6, 1993 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-147877 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,079 | 3,081 | Perforated |
| 3,141 | 3,143 | Perforated |
| 3,167 | 3,169 | Perforated |
| 3,225 | 3,227 | Perforated |
| 3,898 | 3,919 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 367 | 12.25 | 185 S |
| 4.5 | 4,698 | 7.875 | 285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 23, 2009 | Aug 20, 2009 | — |
| 00 | Apr 1, 2009 | Feb 26, 2009 | — |
| 00 | May 7, 1998 | Apr 2, 1998 | — |
| 00 | Mar 29, 1995 | Mar 13, 1995 | — |
| 00 | Mar 2, 1994 | Jan 31, 1994 | Yes |
| 00 | Feb 4, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-32615 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-32615 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 122K
- bbl, last 12 reported months
- 1.47M
- bbl, all reported
- Nov 2008
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000081252 | W-14 Disposal | Plugged Dec 10, 2021 | 3,000 | 1,950 | 3,890–3,920 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 122,359 · prior 12 152,291(-20%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42732615, documented in the API reference.