WELL · 42-427-32809 · DISTRICT 4
Wood A #2
Starr County · Arroyo Los Olmos (Yegua 25) field · Producing · Vertical
Wood A #2 (API 42-427-32809) is a well in Starr County operated by Caribbean Energy LLC II, completed February 14, 1996 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued December 8, 1995, permitted to 6,000 ft.
It was permitted by Transtexas Gas Corporation and has since transferred to Caribbean Energy LLC II on the wellbore schedule.
Completion filings report 3 formation tops, including Vicksburg, Jackson, Yegua.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.
Cotulla, TX · P-5 Active, filed Sep 18, 2025 · 1 permits on file · (830) 879-5300
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Caribbean Energy LLC II |
| Production reports | Trek Resources, Inc.through Mar 2026 |
| Latest permit | Transtexas Gas CorporationDec 8, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 2
- permits on file
- Dec 8, 1995
- last permit issued
- Feb 14, 1996
- completed
- 0
- cumulative oil, bbl
- 1.3M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 14, 1996
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wood "A" G-4-157779 | Arroyo Los Olmos (Yegua 25) | Caribbean Energy LLC II | 1 | 0 | 1.3M | Feb 1996 – Jul 2026 |
Gas, mcf lease total
Last 12 months 10,586 · prior 12 14,504(-27%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Transtexas Gas CorporationFeb 1996 → Nov 2000
- 2Kaiser-Francis Oil CompanyDec 2000 → Mar 2011
- 3Trek Resources, Inc.Apr 2011 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 442634-98 | Drill | Transtexas Gas Corporation | Feb 27, 1996 | Dec 8, 1995 | Dec 27, 1995 | 6,000 |
| 442634-99 | Drill | Transtexas Gas Corporation | Dec 8, 1995 | Dec 8, 1995 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-157779 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 148 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,392 | 5,501 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7 | 1,000 | 8.75 | 225 S |
| 4.5 | 5,900 | 6.125 | 480 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 6, 1996 | Mar 7, 1996 | Yes |
| 00 | May 9, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-32809 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-32809 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42732809, documented in the API reference.