WELL · 42-427-32832 · DISTRICT 4

Wood A #3

Y

Starr County · Arroyo Los Olmos (Middle Yegua) field · Producing  · Vertical

Wood A #3 (API 42-427-32832) is a well in Starr County operated by Caribbean Energy LLC II, completed November 12, 2013 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1996 and 2002, permitted to 6,000 ft.

It was permitted by Kaiser-Francis Oil Company and has since transferred to Caribbean Energy LLC II on the wellbore schedule.

Completion filings report 3 formation tops, including Vicksburg, Jackson, Yegua.

No lease production has been reported under this well’s leases.

Operator of record

Caribbean Energy LLC II

Permitted by Kaiser-Francis Oil Company; the EWA schedule now lists a different operator.

Cotulla, TX · P-5 Active, filed Sep 18, 2025 · 1 permits on file · (830) 879-5300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCaribbean Energy LLC II
Production reportsTrek Resources, Inc.through Apr 2016
Latest permitKaiser-Francis Oil CompanyDec 17, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
2
permits on file
Dec 17, 2002
last permit issued
Nov 12, 2013
completed
0
cumulative oil, bbl
529K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 12, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wood "A" G-4-158086Arroyo Los Olmos (Yegua 25)Caribbean Energy LLC II10527KMar 1996 – Jul 2026
Wood "A" G-4-202354Arroyo Los Olmos (Middle Yegua)Caribbean Energy LLC II101.44KDec 2002 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationMar 1996 → Nov 2000
  2. 2Kaiser-Francis Oil CompanyDec 2000 → Nov 2002
  3. 3Trek Resources, Inc.Nov 2013 → Apr 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
526174-99RecompletionKaiser-Francis Oil CompanyDec 9, 2002Dec 17, 2002Dec 11, 20026,000
444374-99DrillTranstexas Gas CorporationFeb 1, 1996Feb 1, 1996Feb 21, 19966,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-158086————
—— G-4-202354————

Formation tops

As filed on W-2/G-1. Subsea from 157 ft elevation.Download CSV →

FormationMD ftSubsea
Vicksburg1,180-1,023
VicksburgVICKSBURG 61,180-1,023
Jackson2,020-1,863
Yegua3,680-3,523

Perforations

Perforated and open-hole intervals.

FromToType
4,1644,178Perforated
4,1644,213Perforated
4,2064,213Perforated
5,4125,496Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
7.6251,0009.5330 S
3.56,0006.125825 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 6, 2014Jun 5, 2014—
00Aug 23, 2004Jun 21, 2004Yes
00Jul 23, 2004——
00Jun 5, 1996Apr 18, 1996Yes
00May 28, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42732832, documented in the API reference.