WELL · 42-427-33070 · DISTRICT 4
State of Texas #1
Starr County · Alaniz (Wilcox) field · Producing · Vertical
State Of Texas #1 (API 42-427-33070) is a well in Starr County operated by The Medusa Company, completed May 28, 1998 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 1997 and 2002, permitted to 15,500 ft.
It was permitted by Kebo Oil & Gas, Inc. and has since transferred to The Medusa Company on the wellbore schedule.
Completion filings report 5 formation tops, including Jackson, Hockley, Yegua, Queen City.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Kebo Oil & Gas, Inc.; the EWA schedule now lists a different operator.
McAllen, TX · P-5 Y, filed Dec 4, 2025 · (956) 631-1166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | The Medusa Company |
| Production reports | Safari Production Company, Inc.through Jan 2016 |
| Latest permit | Kebo Oil & Gas, Inc.Mar 8, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,500
- total depth, ft
- 2
- permits on file
- Mar 8, 2002
- last permit issued
- May 28, 1998
- completed
- 0
- cumulative oil, bbl
- 540K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 28, 1998
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State of Texas G-4-169195 | Wildcat | The Medusa Company | 1 | 0 | 540K | May 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kebo Oil & Gas, Inc.Dec 2001 → Mar 2006
- 2Safari Production Company, Inc.Jun 2006 → Jan 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 517995-99 | Field transfer | Kebo Oil & Gas, Inc. | Mar 1, 2002 | Mar 8, 2002 | Jan 14, 1998 | 15,500 |
| 471701-99 | Drill | Sanchez-O'Brien Oil & Gas Corp. | Dec 29, 1997 | Dec 29, 1997 | Jan 14, 1998 | 15,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-169195 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 517 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Jackson | 3,350 | -2,833 |
| Hockley | 5,135 | -4,618 |
| Yegua | 6,105 | -5,588 |
| Queen City | 9,725 | -9,208 |
| Wilcox | 13,020 | -12,503 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,589 | 13,600 | Perforated |
| 13,614 | 13,623 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 910 | 26 | 1,660 S |
| 13.375 | 6,650 | 17.5 | 1,570 S |
| 9.625 | 9,016 | 12.25 | 880 S |
| 3.5 | 13,815 | 8.5 | 405 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 30, 2002 | Mar 26, 2001 | — |
| 00 | Aug 18, 1998 | Jul 28, 1998 | Yes |
| 00 | Aug 6, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-33070 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-33070 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42733070, documented in the API reference.