WELL · 42-427-33383 · DISTRICT 4
Wood/Wardner #1
Starr County · Gregg Wood W. (5530) field · Vertical
Wood/Wardner #1 (API 42-427-33383) is a plugged well in Starr County, plugged September 7, 2011, last operated by Mortimer Production Company.
The RRC has issued one drilling permit (amended once), issued June 22, 2001, permitted to 7,000 ft.
It was permitted by Mortimer Exploration Company and has since transferred to Mortimer Production Company on the wellbore schedule.
Completion filings report one formation top, including Yegua.
Operator of record
Permitted by Mortimer Exploration Company; the EWA schedule now lists a different operator.
San Antonio, TX · P-5 Y, filed Jun 4, 2026 · 53 permits on file · (210) 821-6168
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mortimer Production Company |
| Production reports | Mortimer Production Companythrough Jun 2009 |
| Latest permit | Mortimer Exploration CompanyJun 22, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 2
- permits on file
- Jun 22, 2001
- last permit issued
- Jan 28, 2002
- completed
- 0
- cumulative oil, bbl
- 336K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Sep 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 28, 2002
- Shut in
- —
- Plugged
- Sep 7, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wood/Wardner G-4-189026 | Gregg Wood, W. (5530) | Mortimer Production Company | 1 | 0 | 336K | Jan 2002 – Sep 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mortimer Exploration CompanyApr 2002 → Sep 2003
- 2Mortimer Production CompanyOct 2003 → Jun 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 510615-98 | Drill | Mortimer Exploration Company | May 28, 2002 | Jun 22, 2001 | Nov 1, 2001 | 7,000 |
| 510615-99 | Drill | Mortimer Exploration Company | Jun 22, 2001 | Jun 22, 2001 | — | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-189026 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 169 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| YeguaTOP YEGUA | 3,410 | -3,241 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,538 | 5,548 | Perforated |
| 5,550 | 5,559 | Perforated |
| 5,565 | 5,578 | Perforated |
| 5,583 | 5,605 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 535 | 12.25 | 210 S |
| 7 | 4,435 | 8.75 | 227 S |
| 4.5 | 6,134 | 6.125 | 235 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 11, 2002 | Apr 1, 2002 | Yes |
| 00 | Jun 17, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-33383 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-33383 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.