WELL · 42-427-33570 · DISTRICT 4

T B Slick Estate #147

N

Starr County · EL Ebanito (Yegua) field  · Vertical

T B Slick Estate #147 (API 42-427-33570) is a well in Starr County operated by Oxy USA Inc., completed July 22, 2003.

The RRC has issued 2 drilling permits (amended twice) between 2003 and 2009, permitted to 14,000 ft.

It was permitted by Shell Western E&P and has since transferred to Oxy USA Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including T-1, T-5, T-13, Nicholson.

No lease production has been reported under this well’s leases.

Operator of record

OXY USA Inc.

Permitted by Shell Western E&P; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Dec 4, 2025 · 3,316 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA Inc.
Production reportsOXY USA Inc.through Aug 2014
Latest permitShell Western E&PNov 13, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
4
permits on file
Nov 13, 2009
last permit issued
Jul 22, 2003
completed
0
cumulative oil, bbl
772K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 22, 2003
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slick, T. B. Estate G-4-259447Hinde (Vicksburg Consolidated)Merit Energy Company1061.2KSep 2010 – Jul 2026
T B Slick Estate G-4-197667EL Ebanito (Yegua)Shell Western E&P10710KJul 2003 – Sep 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Total E&P USA, Inc.Jul 2003 → Dec 2005
  2. 2Shell Western E&PSep 2006 → Apr 2011
  3. 3OXY USA Inc.May 2011 → Aug 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
687077-98RecompletionShell Western E&PAug 10, 2010Nov 13, 2009Aug 27, 201014,000
687077-99RecompletionShell Western E&PNov 6, 2009Nov 13, 2009—14,000
526778-98DrillTotalfinaelf E&P USA IncApr 9, 2003Jan 22, 2003May 26, 200314,000
526778-99DrillTotalfinaelf E&P USA IncDec 27, 2002Jan 22, 2003—14,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-197667————
—— G-4-259447————

Formation tops

As filed on W-2/G-1. Subsea from 372 ft elevation.Download CSV →

FormationMD ftSubsea
T-14,410-4,038
T-56,500-6,128
T-1310,150-9,778
Nicholson10,610-10,238
Eocene11,010-10,638
Yegua11,770-11,398

Perforations

Perforated and open-hole intervals.

FromToType
7,8747,928Perforated
11,76911,779Perforated
11,80811,822Perforated
12,17612,182Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,49517.51,441 S
9.6256,69612.251,100 S
7.62510,8389.51,185 S
3.512,2976.5270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 8, 2011Feb 17, 2011—
00Dec 9, 2003Oct 17, 2003Yes
00Nov 24, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42733570, documented in the API reference.