WELL · 42-427-33808 · DISTRICT 4
Villareal #1
Starr County · Cortez (1600) field · Vertical
Villareal #1 (API 42-427-33808) is a plugged well in Starr County, plugged January 20, 2006, last operated by Double Play Oil & Gas Inc.
The RRC has issued one drilling permit (amended once), issued January 21, 2005, permitted to 3,600 ft.
Operator of record
Portland, TX · P-5 Y, filed Oct 4, 2025 · 260 permits on file · (361) 765-5399
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Double Play Oil & Gas Inc |
| Production reports | Double Play Oil & Gas, Incthrough Sep 2005 |
| Latest permit | Double Play Oil & Gas, IncJan 21, 2005 |
- 3,600
- total depth, ft
- 2
- permits on file
- Jan 21, 2005
- last permit issued
- Mar 9, 2005
- completed
- 0
- cumulative oil, bbl
- 4.05K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2005 THROUGH Jan 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 9, 2005
- Shut in
- —
- Plugged
- Jan 20, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Villareal G-4-214238 | Cortez (1600) | Double Play Oil & Gas, Inc | 1 | 0 | 4.05K | Mar 2005 – Jan 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Double Play Oil & Gas, IncJun 2005 → Sep 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 556586-98 | Drill | Double Play Oil & Gas, Inc | Nov 7, 2005 | Jan 21, 2005 | Jan 23, 2005 | 3,600 |
| 556586-99 | Drill | Omega Energy Corp. | Jan 21, 2005 | Jan 21, 2005 | — | 3,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-214238 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,685 | 1,690 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 350 | 12.25 | 231 S |
| 4.5 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 8, 2006 | Nov 4, 2005 | Yes |
| 00 | Feb 28, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-33808 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-33808 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42733808, documented in the API reference.