WELL · 42-427-33951 · DISTRICT 4
Starr Produce Company #1
Starr County · Garcias Ridge (Queen City) field · Vertical
Starr Produce Company #1 (API 42-427-33951) is a plugged well in Starr County, plugged February 19, 2018, last operated by Mortimer Production Company.
The RRC has issued one drilling permit, issued March 21, 2006, permitted to 9,800 ft.
It was permitted by Opex Energy, LLC and has since transferred to Mortimer Production Company on the wellbore schedule.
Completion filings report 2 formation tops, including Yegua, Queen City.
Operator of record
Permitted by Opex Energy, LLC; the EWA schedule now lists a different operator.
San Antonio, TX · P-5 Y, filed Jun 4, 2026 · 53 permits on file · (210) 821-6168
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mortimer Production Company |
| Production reports | Mortimer Production Companythrough Aug 2017 |
| Latest permit | Opex Energy, LLCMar 21, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,800
- total depth, ft
- 1
- permits on file
- Mar 21, 2006
- last permit issued
- Oct 10, 2006
- completed
- 0
- cumulative oil, bbl
- 296K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2006 THROUGH Jul 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 10, 2006
- Shut in
- —
- Plugged
- Feb 19, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Starr Produce Company G-4-222925 | Garcias Ridge (Queen City) | Mortimer Production Company | 1 | 0 | 296K | Oct 2006 – Jul 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Opex Energy, LLCOct 2006 → Mar 2007
- 2Exploration Company, TheApr 2007 → Jun 2007
- 3Txco Resources Inc.Jul 2007 → Jun 2008
- 4Mortimer Production CompanyJul 2008 → Aug 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 616115-99 | Drill | Opex Energy, LLC | Mar 20, 2006 | Mar 21, 2006 | — | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-222925 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 15 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 6,650 | -6,635 |
| Queen City | 8,976 | -8,961 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,041 | 9,052 | Perforated |
| 9,065 | 9,072 | Perforated |
| 9,174 | 9,178 | Perforated |
| 9,180 | 9,184 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,020 | 14.75 | 610 S |
| 7.625 | 6,630 | 9.875 | 510 S |
| 4.5 | 9,678 | 6.75 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 30, 2007 | Oct 16, 2006 | Yes |
| 00 | Dec 7, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-427-33951 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-427-33951 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42733951, documented in the API reference.