WELL · 42-429-31143 · DISTRICT 8

Transierra-Cunningham #2

Plugged

Stephens County  · Vertical

Transierra-Cunningham #2 (API 42-429-31143) is a plugged well in Stephens County, plugged March 27, 1986, last operated by Transierra Exploration Corp..

The RRC has issued one drilling permit, issued November 20, 1979, permitted to 3,230 ft.

Operator of record

Transierra Exploration Corp.

Irvine, CA · P-5 Y, filed Aug 5, 2016 · 50 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTransierra Exploration Corp.Nov 20, 1979
3,230
total depth, ft
1
permits on file
Nov 20, 1979
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 27, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
70243-99OtherTransierra Exploration Corp.Nov 20, 1979Nov 20, 1979Dec 16, 19763,230

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.93K
bbl, last 12 reported months
11.7K
bbl, all reported
Apr 1985
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000049164W-14 DisposalPlugged Apr 25, 19861501,0003,151–3,220

MONTHLY INJECTED, BBL · H-10 · LAST 16 REPORTED MONTHS

Last 12 months 8,455

05001K19841985

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42931143, documented in the API reference.