WELL · 42-429-32304 · DISTRICT 7
Pugh #2
Stephens County · Moon SE. (Marble Falls 3940) field · Vertical
Pugh #2 (API 42-429-32304) is a well in Stephens County operated by Tri-Mor Production Company, completed October 26, 1979.
The RRC has issued 2 drilling permits between 1979 and 1980, permitted to 5,000 ft.
Its 2 leases have reported 3.86K barrels of oil and 82.4K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Graham, TX · P-5 Y, filed Sep 14, 1990 · 46 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tri-Mor Production Company |
| Production reports | 4W Operating, LLCthrough Apr 2026 |
| Latest permit | Tri-Mor Production CompanyDec 23, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 2
- permits on file
- Dec 23, 1980
- last permit issued
- Oct 26, 1979
- completed
- 3.86K
- cumulative oil, bbl
- 82.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 26, 1979
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pugh O-8-25724 | Moon (Marble Falls Lime) | 4W Operating, LLC | 1 | 3.86K | 82.4K | Jan 1993 – Jul 2026 |
| — G-8-91042 | — | — | 0 | 0 | 0 | — |
Gas, mcf lease total
Last 12 months 4,331 · prior 12 2,248(+93%)
Oil, barrels lease total
Last 12 months 0 · prior 12 41(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Glahn Resources, Inc.Aug 1993 → Sep 1993
- 2Russell Brothers Oil & GasApr 2000 → Dec 2004
- 3Russell Bros. Oil & Gas, Inc.Jan 2005 → Jun 2019
- 44W Operating, LLCSep 2019 → Sep 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 103113-99 | Recompletion | Tri-Mor Production Company | Dec 23, 1980 | Dec 23, 1980 | — | 4,150 |
| 60139-99 | Drill | Tri-Mor Production Company | Oct 10, 1979 | Oct 10, 1979 | Oct 18, 1979 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-91042 | — | — | — | — |
| — | — O-8-25724 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,010 | 4,016 | Perforated |
| 4,382 | 4,386 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 11 | 85 S |
| 2.375 | 3,930 | — | — |
| 2.375 | 4,350 | — | — |
| 4.5 | 4,500 | 7.875 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 26, 1990 | Feb 21, 1990 | — |
| 00 | Mar 8, 1990 | — | — |
| 00 | Jan 12, 1984 | Dec 23, 1980 | — |
| 00 | Jan 12, 1984 | Nov 9, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-32304 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-32304 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.