WELL · 42-429-32336 · DISTRICT 8

Harbison, Dale et AL #1

Plugged

Stephens County  · Vertical

Harbison, Dale ET AL #1 (API 42-429-32336) is a plugged well in Stephens County, plugged January 12, 1980, last operated by Walsh & Trant Petroleum Corp..

The RRC has issued one drilling permit, issued November 1, 1979, permitted to 4,465 ft.

Operator of record

Walsh & Trant Petroleum Corp.

Tyler, TX · P-5 Y, filed Oct 14, 1982 · 86 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitWalsh & Trant Petroleum Corp.Nov 1, 1979
4,465
total depth, ft
1
permits on file
Nov 1, 1979
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 12, 1980

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
62745-99DrillWalsh & Trant Petroleum Corp.Nov 1, 1979Nov 1, 1979Jan 2, 19804,465

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42932336, documented in the API reference.