WELL · 42-429-32375 · DISTRICT 7
Ball Sam #1
Stephens County · Harding Bros. N. (Miss.) field · Vertical
Ball Sam #1 (API 42-429-32375) is a plugged well in Stephens County, plugged August 27, 1993, last operated by Ball Producing CO..
The RRC has issued one drilling permit, issued December 13, 1979, permitted to 4,600 ft.
Completion filings report 2 formation tops, including Caddo, Mississippian.
Operator of record
Argyle, TX · P-5 Y, filed Oct 4, 2025 · 41 permits on file · (918) 214-3560
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ball Producing Co. |
| Production reports | none |
| Latest permit | Ball Producing Co.Dec 13, 1979 |
- 4,600
- total depth, ft
- 1
- permits on file
- Dec 13, 1979
- last permit issued
- Mar 15, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 15, 1987
- Shut in
- —
- Plugged
- Aug 27, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ball, Sam O-8-24271 | Harding Bros., N. (Miss.) | Ball Producing Co. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 66762-99 | Drill | Ball Producing Co. | Dec 13, 1979 | Dec 13, 1979 | Feb 13, 1980 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24271 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,142 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,606 | -2,464 |
| MississippianMISS. | 4,239 | -3,097 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,262 | 4,274 | Perforated |
| 4,264 | 4,274 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 120 | 12.25 | 75 S |
| 2.375 | 4,330 | — | — |
| 4.5 | 4,600 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 30, 1987 | Nov 2, 1987 | Yes |
| 00 | Apr 17, 1987 | — | — |
| 00 | Jan 12, 1984 | Jul 1, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-32375 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-32375 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 60
- bbl, last 12 reported months
- 4.3K
- bbl, all reported
- Apr 1993
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000062275 | H-1 Injection | Plugged Aug 31, 1993 | 1,500 | 1,000 | 4,264–4,274 |
| 000065023 | H-1 Injection | Plugged Aug 31, 1993 | 1,500 | 1,000 | 4,264–4,274 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 60 · prior 12 1,519(-96%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42932375, documented in the API reference.