WELL · 42-429-32468 · DISTRICT 7
Tolle #1
Stephens County · Vertical
Tolle #1 (API 42-429-32468) is a permitted well in Stephens County filed by Patterson Oil Company, The; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1980 and 1985, permitted to 3,646 ft.
Completion filings report one formation top, including Gardner Sand.
Its lease has reported 7.57K barrels of oil and 2.13K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Eastland, TX · P-5 Y, filed May 1, 1998 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Eastland Operating, L.L.C.through Apr 2026 |
| Latest permit | Patterson Oil Company, TheAug 1, 1985 |
- 3,646
- total depth, ft
- 3
- permits on file
- Aug 1, 1985
- last permit issued
- —
- completed
- 7.57K
- cumulative oil, bbl
- 2.13K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tolle O-8-22987 | JMP (Strawn Sand) | Eastland Operating, L.L.C. | 1 | 7.57K | 2.13K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 166 · prior 12 224(-26%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Patterson Oil Company, TheJan 1993 → Jun 1994
- 2Mustang Oil & Gas CorporationJul 1994 → Jun 1998
- 3Gruy Petroleum Management Co.Jul 1998 → Sep 1998
- 4Eastland Operating, L.L.C.Mar 2000 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 283405-99 | Recompletion | Patterson Oil Company, The | Jul 31, 1985 | Aug 1, 1985 | — | 3,550 |
| 94252-99 | Recompletion | P & R Oil, Inc. | Sep 30, 1980 | Sep 30, 1980 | — | 3,646 |
| 76071-99 | Drill | P & R Oil, Inc. | Mar 24, 1980 | Mar 24, 1980 | — | 3,580 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-22987 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,497 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gardner Sand | 2,595 | -1,098 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,600 | 2,607 | Perforated |
| 3,576 | 3,580 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 288 | 12.25 | 240 S |
| 2.375 | 3,480 | — | — |
| 4.5 | 4,018 | 7.875 | 210 S |
| 4.5 | 4,057 | 7.875 | 210 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 14, 1985 | Jul 29, 1985 | — |
| 00 | Oct 10, 1985 | — | — |
| 00 | Jan 12, 1984 | Sep 18, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-32468 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-32468 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42932468, documented in the API reference.