WELL · 42-429-32696 · DISTRICT 7
Black 1176 #1
Stephens County · Stephens County Regular (Gas) field · Vertical
Black 1176 #1 (API 42-429-32696) is a plugged well in Stephens County, plugged February 26, 2002, last operated by Seely Oil Company.
The RRC has issued one drilling permit, issued October 2, 1980, permitted to 3,339 ft.
Operator of record
Fort Worth, TX · P-5 X, filed Dec 18, 2025 · 153 permits on file · (817) 332-1377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seely Oil Company |
| Production reports | none |
| Latest permit | Seely Oil Co.Oct 2, 1980 |
- 3,339
- total depth, ft
- 1
- permits on file
- Oct 2, 1980
- last permit issued
- Dec 12, 1980
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 12, 1980
- Shut in
- —
- Plugged
- Feb 26, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Black "1176" O-8-24130 | Stephens County Regular | Cam Company | 1 | 0 | 0 | Jan 1993 – Mar 2002 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 94454-99 | Drill | Seely Oil Co. | Oct 2, 1980 | Oct 2, 1980 | Nov 3, 1980 | 3,339 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-24130 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,238 | 3,256 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 110 | 12.25 | 110 S |
| 2.375 | 3,207 | — | — |
| 4.5 | 3,300 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 21, 1987 | Jan 26, 1987 | — |
| 00 | Feb 6, 1987 | — | — |
| 00 | Jan 12, 1984 | Jan 27, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-32696 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-32696 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 74.8K
- bbl, all reported
- May 2001
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000055243 | H-1 Injection | Plugged Mar 25, 2002 | 0 | 0 | 3,238–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.