WELL · 42-429-32849 · DISTRICT 7
Jennings G.C. #3
Stephens County · Stephens County Regular (Gas) field · Vertical
Jennings G.C. #3 (API 42-429-32849) is a plugged well in Stephens County, plugged January 19, 2026, last operated by Richey Ray Management CO. Inc..
The RRC has issued one drilling permit, issued September 14, 1981, permitted to 4,600 ft.
It was permitted by Pinto Petroleum Inc. and has since transferred to Richey Ray Management CO. Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Lake, Duffer, Mississippian, Ellen..
Operator of record
Richey Ray Management Co. Inc.
Permitted by Pinto Petroleum Inc.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 136 permits on file · (800) 800-2908
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Richey Ray Management Co. Inc. |
| Production reports | Richey, Ray Management Co., Inc.through Jan 2009 |
| Latest permit | Pinto Petroleum Inc.Sep 14, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,600
- total depth, ft
- 1
- permits on file
- Sep 14, 1981
- last permit issued
- Jun 24, 1982
- completed
- 0
- cumulative oil, bbl
- 28.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 24, 1982
- Shut in
- —
- Plugged
- Jan 19, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jennings,g.c. G-8-124344 | Stephens County Regular (Gas) | Richey, Ray Management Co., Inc. | 1 | 0 | 28.4K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Richey, Ray Management Co., Inc.Jan 1993 → Jan 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 133352-99 | Drill | Pinto Petroleum Inc. | Sep 14, 1981 | Sep 14, 1981 | Dec 4, 1981 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-124344 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,275 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lake | 3,636 | -2,361 |
| Duffer | 3,727 | -2,452 |
| MississippianMISS. | 3,928 | -2,653 |
| Ellen. | 4,053 | -2,778 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,727 | 3,757 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 200 | 11 | 200 S |
| 2.375 | 3,635 | — | — |
| 4.5 | 4,202 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 8, 1987 | Jun 16, 1987 | — |
| 00 | Jun 29, 1987 | — | — |
| 00 | Jan 12, 1984 | Aug 24, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-32849 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-32849 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42932849, documented in the API reference.