WELL · 42-429-33641 · DISTRICT 7

Janetta-Jennings #1

Plugged

Stephens County · Jill (Duffer) field  · Vertical

Janetta-Jennings #1 (API 42-429-33641) is a plugged well in Stephens County, plugged July 26, 2012, last operated by Richey Ray Management CO. Inc..

The RRC has issued one drilling permit, issued March 31, 1983, permitted to 4,500 ft.

It was permitted by Hondo Energy, Ltd. and has since transferred to Richey Ray Management CO. Inc. on the wellbore schedule.

Operator of record

Richey Ray Management Co. Inc.

Permitted by Hondo Energy, Ltd.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 136 permits on file · (800) 800-2908

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRichey Ray Management Co. Inc.
Production reportsRichey, Ray Management Co., Inc.through Mar 2008
Latest permitHondo Energy, Ltd.Mar 31, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
Mar 31, 1983
last permit issued
May 15, 1983
completed
0
cumulative oil, bbl
55.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 15, 1983
Shut in
—
Plugged
Jul 26, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Janetta-Jennings G-8-107126Jill (Duffer)Richey, Ray Management Co., Inc.1055.4KJan 1993 – Jul 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Richey, Ray Management Co., Inc.Jan 1993 → Mar 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
192031-99DrillHondo Energy, Ltd.Mar 31, 1983Mar 31, 1983Apr 20, 19834,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-107126————

Perforations

Perforated and open-hole intervals.

FromToType
3,7143,724Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516012.2595 S
2.3753,604——
4.53,8417.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Aug 25, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42933641, documented in the API reference.