WELL · 42-429-33948 · DISTRICT 7
Flournoy B #B4
Stephens County · Stephens County Regular field · Vertical
Flournoy B #B4 (API 42-429-33948) is a plugged well in Stephens County, plugged November 14, 2013, last operated by Hill Charles Drilling Inc..
The RRC has issued one drilling permit, issued December 22, 1983, permitted to 2,500 ft.
It was permitted by Hillco Petroleum Inc. and has since transferred to Hill Charles Drilling Inc. on the wellbore schedule.
Completion filings report one formation top, including Strawn.
Operator of record
Permitted by Hillco Petroleum Inc.; the EWA schedule now lists a different operator.
Grand Prairie, TX · P-5 Y, filed Apr 2, 2015 · 19 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hill Charles Drilling Inc. |
| Production reports | Hill, Charles Drilling, Inc.through Oct 2008 |
| Latest permit | Hillco Petroleum Inc.Dec 22, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,500
- total depth, ft
- 1
- permits on file
- Dec 22, 1983
- last permit issued
- Jan 25, 1984
- completed
- 0
- cumulative oil, bbl
- 11.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 25, 1984
- Shut in
- —
- Plugged
- Nov 14, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flournoy "B" G-8-111235 | Stephens County Regular | Hill, Charles Drilling, Inc. | 1 | 0 | 11.1K | Jan 1993 – Nov 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1First American Operating Co.Jan 1993 → Oct 2002
- 2Pierson FuelsJan 2001 → Jul 2001
- 3Misener OperatingNov 2002 → Jun 2003
- 4Misener Operating, Inc.Jul 2003 → Jun 2004
- 5H C Oil & Gas Corp.Jul 2004 → Jul 2004
- 6Hill, Charles Drilling, Inc.Aug 2008 → Oct 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 224016-99 | Drill | Hillco Petroleum Inc. | Nov 28, 1983 | Dec 22, 1983 | — | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-111235 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,387 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 1,810 | -423 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,810 | 1,844 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 247 | 12.25 | 175 sx |
| 4.5 | 2,318 | 6.75 | 100 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 12, 1984 | May 29, 1984 | — |
| 00 | Jul 11, 1984 | May 29, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-33948 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-33948 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42933948, documented in the API reference.