WELL · 42-429-33968 · DISTRICT 7
Clark Lester #1
Stephens County · Ivadell (Miss) field · Vertical
Clark Lester #1 (API 42-429-33968) is a plugged well in Stephens County, plugged June 23, 2000, last operated by Carrland Oil & Gas Inc..
The RRC has issued one drilling permit, issued January 17, 1984, permitted to 4,700 ft.
It was permitted by Timn Oil CO. and has since transferred to Carrland Oil & Gas Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Caddo, Duffer, Mississippian.
Its lease has reported 7.87K barrels of oil and 54 mcf of gas since January 1993, last reporting in September 2000.
Operator of record
Permitted by Timn Oil Co.; the EWA schedule now lists a different operator.
Prosper, TX · P-5 Y, filed May 4, 2026 · 1 permits on file · (325) 668-4545
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Carrland Oil & Gas Inc. |
| Production reports | Carrland Oil & Gas Inc.through Apr 1999 |
| Latest permit | Timn Oil Co.Jan 17, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 1
- permits on file
- Jan 17, 1984
- last permit issued
- Feb 3, 1984
- completed
- 7.87K
- cumulative oil, bbl
- 54
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 3, 1984
- Shut in
- —
- Plugged
- Jun 23, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Clark, Lester O-8-20868 | Ivadell (Miss) | Carrland Oil & Gas Inc. | 1 | 7.87K | 54 | Jan 1993 – Sep 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Timn Oil Co.Jan 1993 → Aug 1997
- 2Whitley OperatingSep 1997 → Jan 1999
- 3Carrland Oil & Gas Inc.Apr 1999 → Apr 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 226617-99 | Drill | Timn Oil Co. | Jan 17, 1984 | Jan 17, 1984 | Jan 21, 1984 | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-20868 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,180 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,480 | -2,300 |
| Duffer | 4,202 | -3,022 |
| MississippianMISSISSIPPI | 4,400 | -3,220 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,400 | 4,420 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 130 | 12.25 | 90 S |
| 4.5 | 4,610 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 27, 1984 | Mar 13, 1984 | — |
| 00 | Mar 20, 1984 | Mar 13, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-33968 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-33968 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42933968, documented in the API reference.