WELL · 42-429-34889 · DISTRICT 7

Dickie Ranch Waterflood Unit #2

Plugged

Stephens County · Dickie Ranch (Strawn) field  · Vertical

Dickie Ranch Waterflood Unit #2 (API 42-429-34889) is a plugged well in Stephens County, plugged December 4, 2003, last operated by Ram Oil And Gas Inc..

The RRC has issued one drilling permit, issued July 13, 1987, permitted to 4,999 ft.

It was permitted by Goopco, Inc. and has since transferred to Ram Oil And Gas Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Home Creek Lime, Palo Pinto, Dog Bend Lime, Cross-Cut Sand.

Its 2 leases have reported 439K barrels of oil and 23K mcf of gas since January 1993, last reporting in July 2026. The leases carry 25 wells, so these are lease totals, not this well alone.

Operator of record

Ram Oil and Gas Inc.

Permitted by Goopco, Inc.; the EWA schedule now lists a different operator.

Walsh, CO · P-5 Y, filed Jul 4, 2026 · (940) 456-0520

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRam Oil and Gas Inc.
Production reportsRam Oil and Gas, Inc.through Apr 2025
Latest permitGoopco, Inc.Jul 13, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
1
permits on file
Jul 13, 1987
last permit issued
Aug 11, 1987
completed
439K
cumulative oil, bbl
23K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 11, 1987
Shut in
—
Plugged
Dec 4, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 25 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dickie Ranch Waterflood Unit O-8-28003Dickie Ranch (Strawn)Ram Oil and Gas, Inc.21412K533Nov 1996 – Jul 2026
Dickie "B" O-8-24149Dickie Ranch (Strawn)Hawkins Energy Corporation427.8K22.5KJan 1993 – Jan 1997

Oil, barrels lease total

Last 12 months 0 · prior 12 8(-100%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Goopco, Inc.Jan 1993 → Apr 1995
  2. 2Hawkins Oil & Gas, Inc.May 1995 → Apr 1996
  3. 3Hawkins Energy CorporationMay 1996 → Apr 1997
  4. 4Sunterra Energy CorporationMay 1997 → Apr 1998
  5. 5Stephens & Johnson Operating Co.May 1998 → Jul 2007
  6. 6Kimbrel Oil CorporationAug 2007 → Jun 2011
  7. 7Arval/Adnan LLCJul 2011 → Dec 2013
  8. 8Trailblazer Energy LLCJan 2014 → Nov 2023
  9. 9Ram Oil and Gas, Inc.Mar 2024 → Apr 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
332653-99DrillGoopco, Inc.Jul 9, 1987Jul 13, 1987—4,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24149————
—— O-8-28003————

Formation tops

As filed on W-2/G-1. Subsea from 1,200 ft elevation.Download CSV →

FormationMD ftSubsea
Home Creek Lime1,15446
Palo PintoPALO PINTO LIME1,880-680
Dog Bend Lime2,732-1,532
Cross-Cut Sand2,766-1,566

Perforations

Perforated and open-hole intervals.

FromToType
2,7672,772Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510212.2575 S
4.52,8177.875110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 5, 1996Aug 28, 1987Yes
00Sep 14, 1987Aug 28, 1987Yes
00Sep 2, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42934889, documented in the API reference.