WELL · 42-429-35475 · DISTRICT 7

Gilmore-Owens Unit #1

N

Stephens County · Stephens County Regular field  · Horizontal

Gilmore-Owens Unit #1 (API 42-429-35475) is a horizontal well in Stephens County operated by Kerr-Mcgee Oil & Gas Onshore LLC, completed November 2, 1994.

The RRC has issued 2 drilling permits (amended twice) between 1994 and 2000, permitted to 5,014 ft.

Completion filings report one formation top, including Mississippian.

Its 2 leases have reported 11.8K barrels of oil and 698K mcf of gas since November 1994, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Kerr-McGee Oil & Gas Onshore LLC

The Woodlands, TX · P-5 Y, filed Jul 6, 2007 · 377 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKerr-McGee Oil & Gas Onshore LLC
Production reportsBasa Resources, Inc.through May 2024
Latest permitKerr-McGee Oil & Gas Onshore LLCAug 31, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,014
total depth, ft
4
permits on file
Aug 31, 2000
last permit issued
Nov 2, 1994
completed
11.8K
cumulative oil, bbl
698K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 2, 1994
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gilmore-Owen Unit G-8-179761Upper Johnson Crossing (Congl.)Basa Resources, Inc.10688KAug 2000 – Jul 2026
Gilmore-Owens Unit O-8-27351Stephens County RegularKerr-McGee Oil & Gas Onshore LLC111.8K10.8KNov 1994 – Dec 2000

Gas, mcf lease total

Last 12 months 0 · prior 12 209(-100%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oryx Energy CompanyNov 1994 → Mar 1999
  2. 2Kerr-McGee CorporationApr 1999 → Sep 1999
  3. 3Kerr-McGee Oil & Gas Onshore LLCOct 1999 → Jul 2003
  4. 4Basa Resources, Inc.Aug 2003 → May 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
499109-99RecompletionKerr-McGee Oil & Gas Onshore LLCAug 31, 2000Aug 31, 2000Aug 15, 20005,014
425133-97DrillOryx Energy CompanyNov 23, 1994Jun 21, 1994—4,600
425133-98DrillOryx Energy CompanyAug 11, 1994Jun 21, 1994Sep 24, 19944,600
425133-99DrillOryx Energy CompanyJun 21, 1994Jun 21, 1994—4,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-179761————
—— O-8-27351————

Formation tops

As filed on W-2/G-1. Subsea from 1,160 ft elevation.Download CSV →

FormationMD ftSubsea
MississippianMISSISSIPPI LIME4,403-3,243

Perforations

Perforated and open-hole intervals.

FromToType
3,9263,936Perforated
3,9503,958Perforated
4,4035,014Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62553012.25250 S
74,4038.75775 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 24, 2001Sep 7, 2000Yes
00Dec 5, 2000——
00Dec 15, 1994Nov 23, 1994Yes
00Dec 9, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42935475, documented in the API reference.