WELL · 42-429-35900 · DISTRICT 7
Pendleton Unit #1
Stephens County · Olive Mae (Caddo) field · Vertical
Pendleton Unit #1 (API 42-429-35900) is a well in Stephens County operated by Petex, completed August 31, 2001.
The RRC has issued one drilling permit, issued June 22, 2001, permitted to 4,500 ft.
It was permitted by Mcclymond, Inc. and has since transferred to Petex on the wellbore schedule.
Completion filings report one formation top, including Caddo.
Its 2 leases have reported 13.3K barrels of oil and 330K mcf of gas since September 2001, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by McClymond, Inc.; the EWA schedule now lists a different operator.
Breckenridge, TX · P-5 Y, filed May 4, 2026 · 124 permits on file · (254) 559-5453
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petex |
| Production reports | Petexthrough Aug 2022 |
| Latest permit | McClymond, Inc.Jun 22, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Jun 22, 2001
- last permit issued
- Aug 31, 2001
- completed
- 13.3K
- cumulative oil, bbl
- 330K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 31, 2001
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pendleton Unit G-8-288514 | Olive Mae (Caddo) | Petex | 1 | 0 | 585 | Oct 2019 – Jul 2026 |
| Pendleton Unit O-8-29037 | Olive Mae (Caddo) | Petex | 1 | 13.3K | 329K | Sep 2001 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1McClymond, Ltd.Sep 2001 → Dec 2009
- 2PetexJan 2010 → Aug 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 510461-99 | Drill | McClymond, Inc. | Jun 19, 2001 | Jun 22, 2001 | Jun 30, 2001 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-288514 | — | — | — | — |
| — | — O-8-29037 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,274 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,298 | -2,024 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,324 | 3,340 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 127 | 12.25 | 100 S |
| 5.5 | 3,608 | 7.875 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 14, 2020 | Oct 25, 2019 | — |
| 00 | Oct 26, 2001 | Sep 26, 2001 | Yes |
| 00 | Oct 12, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-35900 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-35900 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42935900, documented in the API reference.