WELL · 42-429-36025 · DISTRICT 7
Thompson #1
Stephens County · Cliff Hanger (Miss) field · Vertical
Thompson #1 (API 42-429-36025) is a plugged well in Stephens County, plugged May 3, 2006, last operated by Three P Operating CO. GP L.L.C..
The RRC has issued one drilling permit, issued September 10, 2003, permitted to 4,600 ft.
It was permitted by Three P Operating Company and has since transferred to Three P Operating CO. GP L.L.C. on the wellbore schedule.
Completion filings report 2 formation tops, including Caddo, Mississippian.
Its lease has reported 4.75K barrels of oil and 11.8K mcf of gas since November 2003, last reporting in January 2012.
Operator of record
Three P Operating Co. GP L.L.C.
Permitted by Three P Operating Company; the EWA schedule now lists a different operator.
Newcastle, TX · P-5 Y, filed Jul 4, 2026 · 37 permits on file · (940) 550-5157
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Three P Operating Co. GP L.L.C. |
| Production reports | Three P Operating Companythrough Mar 2005 |
| Latest permit | Three P Operating CompanySep 10, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,600
- total depth, ft
- 1
- permits on file
- Sep 10, 2003
- last permit issued
- Nov 10, 2003
- completed
- 4.75K
- cumulative oil, bbl
- 11.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2003 THROUGH Jan 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 10, 2003
- Shut in
- —
- Plugged
- May 3, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thompson O-8-29318 | Cliff Hanger (Miss) | Three P Operating Co.,gp, L.L.C. | 1 | 4.75K | 11.8K | Nov 2003 – Jan 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Three P Operating CompanyNov 2003 → Mar 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 536170-99 | Drill | Three P Operating Company | Sep 8, 2003 | Sep 10, 2003 | Oct 9, 2003 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29318 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,155 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,314 | -2,159 |
| MississippianMISSISSIPPI | 4,182 | -3,027 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,368 | 4,374 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 134 | 12.25 | 100 S |
| 4.5 | 4,449 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 23, 2003 | Nov 21, 2003 | Yes |
| 00 | Dec 8, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-429-36025 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-429-36025 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42936025, documented in the API reference.