WELL · 42-431-00280 · DISTRICT 7

Johnson Lou E. Est. #16

Plugged

Sterling County · Jameson (Strawn) field  · Vertical

Johnson Lou E. Est. #16 (API 42-431-00280) is a plugged well in Sterling County, plugged March 30, 1973, last operated by Exxon Corp..

The RRC has issued one drilling permit, issued February 3, 1984, permitted to 6,910 ft.

Its lease has reported 142K barrels of oil and 2.32M mcf of gas since January 1993, last reporting in July 2026. The lease carries 16 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Exxon Corp.

Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsQuail Ridge Petroleum LLCthrough Mar 2026
Latest permitExxon Corp.Feb 3, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,910
total depth, ft
1
permits on file
Feb 3, 1984
last permit issued
—
completed
142K
cumulative oil, bbl
2.32M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 30, 1973

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson, Lou E. Estate a/C 2 O-9-7940Jameson (Strawn)Quail Ridge Petroleum LLC16142K2.32MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 13,038 · prior 12 20,109(-35%)

02K4K6K202420252026

Oil, barrels lease total

Last 12 months 605 · prior 12 1,472(-59%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Miresco, Inc.Jan 1993 → Mar 1994
  2. 2Midland Res. Oper. Co., Inc.Apr 1994 → Oct 1998
  3. 3Vista Resources, Inc. (A)Nov 1998 → Feb 2000
  4. 4Prize Operating CompanyMar 2000 → Mar 2002
  5. 5Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  6. 6Cimarex Energy Co. of ColoradoMay 2006 → Nov 2006
  7. 7Quantum Resources Management,llcDec 2006 → Dec 2014
  8. 8Breitburn Operating L.P.Jan 2015 → Jun 2022
  9. 9Quail Ridge Petroleum LLCDec 2022 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
228521-99OtherExxon Corp.Feb 3, 1984Feb 3, 1984—6,910

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-7940————

Perforations

Perforated and open-hole intervals.

FromToType
6,7466,864Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62548111160 sx
5.56,9107.8751,300 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 6, 1984Mar 7, 1984—
00Mar 15, 1984Mar 7, 1984—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
696K
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000050804H-1 InjectionActive006,746–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43100280, documented in the API reference.