WELL · 42-431-31146 · DISTRICT 8

Rose Creek North Unit #4

Plugged

Sterling County · Rose Creek N (Wolfcamp) field  · Vertical

Rose Creek North Unit #4 (API 42-431-31146) is a plugged well in Sterling County, plugged August 28, 2024, last operated by Kek Exploration LLC.

The RRC has issued one drilling permit, issued June 8, 1982, permitted to 5,200 ft.

It was permitted by Quanah Petroleum Inc. and has since transferred to Kek Exploration LLC on the wellbore schedule.

Completion filings report one formation top, including Wolfcamp.

Its 2 leases have reported 1.24M barrels of oil and 87.7K mcf of gas since January 1993, last reporting in July 2026. The leases carry 37 wells, so these are lease totals, not this well alone.

Operator of record

Kek Exploration LLC

Permitted by Quanah Petroleum Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Oct 4, 2025 · 8 permits on file · (432) 813-2948

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKek Exploration LLC
Production reportsKek Exploration LLCthrough Apr 2026
Latest permitQuanah Petroleum Inc.Jun 8, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,200
total depth, ft
1
permits on file
Jun 8, 1982
last permit issued
—
completed
1.24M
cumulative oil, bbl
87.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 28, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 37 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rose Creek North Unit O-10-32758Rose Creek, N (Wolfcamp)Kek Exploration LLC371.24M87.7KJan 1993 – Jul 2026
— O-10-27109——000—

Oil, barrels lease total

Last 12 months 461 · prior 12 255(+81%)

0100200202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fasken, BarbaraJan 1993 → Dec 1995
  2. 2Fasken Oil and Ranch, Ltd.Jan 1996 → Jul 2023
  3. 3New Height Energy, LLCAug 2023 → Apr 2025
  4. 4Kek Exploration LLCMay 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
163459-99DrillQuanah Petroleum Inc.Jun 8, 1982Jun 8, 1982—5,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-27109————
—— O-10-32758————
—— O-10-32758————

Formation tops

As filed on W-2/G-1. Subsea from 2,237 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp4,959-2,722

Perforations

Perforated and open-hole intervals.

FromToType
4,9895,023Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6259012.25650 S
8.62595012.25650 S
4.55,1107.875870 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 1993Jan 7, 1993—
00Feb 4, 1993—Yes
00Jul 10, 1990——
00Nov 12, 1984Oct 29, 1984—
00Mar 7, 1984Aug 2, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
864K
bbl, all reported
Jan 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077637H-1 InjectionPlugged Apr 21, 20255001,5004,950–5,140

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 2,782(-100%)

01K2K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/43131146, documented in the API reference.